Construction prediction and dynamic control of shield tunnel

被引:0
|
作者
Zhou J. [1 ,2 ]
Chai J.-H. [1 ]
Ding X.-H. [3 ]
Yu S.-C. [1 ]
Zhang Y.-W. [1 ]
机构
[1] Department of Geotechnical Engineering, Tongji University, Shanghai
[2] Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University, Shanghai
[3] Shanghai Civil Engineering Co., LTD of CREC Urban Rail Transit Engineering Company, Shanghai
关键词
Construction prediction; Dynamic control; FLAC[!sup]3D[!/sup; Overlapped tunnel; Stratum loss;
D O I
10.11779/CJGE201905004
中图分类号
学科分类号
摘要
It can not be ignored that the construction of shield tunnel in the proximity of the existing structures is risky. The stratum loss is the major cause of ground deformation during the construction process of shield tunnel. It is suggested that the stratum loss rate should be controlled by regulating the construction procedure. Therefore, based on these two premises, a method for construction prediction and dynamic control during shield tunneling is proposed: to establish a relationship between the stratum loss rate and the ground deformation based on the stratum loss theory, meanwhile to dynamically regulate the construction procedure to make ground deformation meet the control requirements. To be more specific, firstly through pilot calculation the maximum stratum loss rate is obtained under the control requirements, then, the construction procedure is dynamically regulated based on the data from constructed sections to make sure that the stratum loss rate of risky sections does not exceed the maximum value and thus meets the requirements of construction safety. Compared with other methods, this method is relatively simple and practical, and at the same time less impressionable by human factors, which makes the results more accurate. Through the example of the project case of Suzhou Metro Line 3, the feasibility of the proposed method is illustrated. The results show that the stratum loss rate should be kept within the limit of 0.76% in the overlapped section. Moreover, some construction advices are also put forward regarding the project of Suzhou Metro Line 3 tunneling beneath Line 1 to significantly lower the construction risks. © 2019, Editorial Office of Chinese Journal of Geotechnical Engineering. All right reserved.
引用
收藏
页码:821 / 828
页数:7
相关论文
共 18 条
  • [1] Peck R.B., Deep excavations and tunnelling in soft ground, Proceedings of the 7th International Conference on Soil Mechanics and Foundation Engineering, pp. 225-290, (1969)
  • [2] Mair R.J., Subsurface settlement profiles above tunnels in clays, Géotechnique, 43, 2, pp. 361-362, (1993)
  • [3] Lee K.M., Rowe R.K., Lo K.Y., Subsidence owing to tunneling: I Estimating the gap parameter, Canadian Geotechnical Journal, 29, 6, pp. 929-940, (1992)
  • [4] Sagaseta C., Analysis of undrained soil deformation due to ground loss, Géotechnique, 37, 3, pp. 301-320, (1987)
  • [5] Loganathan N., Poulos H.G., Analytical prediction for tunneling-induced ground movements in clays, Journal of Geotechnical & Geoenvironmental Engineering, 124, 9, pp. 846-856, (1998)
  • [6] Park K.H., Elastic solution for tunneling-induced ground movements in clays, International Journal of Geomechanics, 4, 4, pp. 310-318, (2004)
  • [7] Liu B.-C., Zhang J.-S., Stochastic method for ground subsidence due to near surface excavation, Chinese Journal of Rock Mechanics and Engineering, 14, 4, pp. 289-296, (1995)
  • [8] Zhu Z.-L., Zhang Q.-H., Yi H.-C., Stochastic theory for predicting longitudinal settlement in soft-soil tunnel, Rock and Soil Mechanics, 22, 1, pp. 56-59, (2001)
  • [9] Yu N., Zhu H.-H., Analysis of earth deformation caused by shield tunnel construction and 3D-FEM simulation, Rock and Soil Mechanics, 25, 8, pp. 1330-1334, (2004)
  • [10] Zhou J., Lu L.-J., Jia M.-C., Research of the strata loss rate of shield tunnel excavation based on FLAC<sup>2D</sup> numerical method, Chinese Journal of Underground Space and Engineering, 10, 4, pp. 902-907, (2014)