The effect of post-construction settlement during pipe jacking construction phase on relative displacement of pipe section

被引:0
|
作者
Zhenyu, Gao [1 ]
Haihong, Mo [1 ]
Jubo, Zeng [1 ]
机构
[1] School of Civil Engineering and Transportation, South China University of Technology, Guangzhou, Guangdong, China
来源
关键词
483.1 Soils and Soil Mechanics - 921.6 Numerical Methods - 951 Materials Science;
D O I
暂无
中图分类号
学科分类号
摘要
7
引用
收藏
页码:7037 / 7048
相关论文
共 50 条
  • [1] Surface displacement during pipe roof construction of pipe-jacking group with large section
    Tang Zheng
    Wang Hong-xin
    Sun De-an
    Zhang Xiao
    ROCK AND SOIL MECHANICS, 2022, 43 (07) : 1933 - 1941
  • [2] Prediction of settlement induced by ground loss during pipe jacking construction
    Wei Gang
    Wu Hua-jun
    Chen Chun-lai
    ROCK AND SOIL MECHANICS, 2007, 28 (02) : 359 - 363
  • [3] Prediction of settlement induced by ground loss during pipe jacking construction
    Department of Civil Engineering, City College, Zhejiang University, Hangzhou 310015, China
    不详
    Rock Soil Mech, 2007, 2 (359-363):
  • [4] Strata displacement in roadbed caused by shallow pipe jacking construction
    Sichuan College of Architectural Technology, Deyang, Sichuan, China
    Electron. J. Geotech. Eng., Z3 (10731-10740):
  • [5] Strata displacement in roadbed caused by shallow pipe jacking construction
    Yang, Zhuan-Yun
    Electronic Journal of Geotechnical Engineering, 2014, 19 (Z3): : 10731 - 10740
  • [6] Influence of construction sequence of pipe jacking by pipe-roof pre-construction method on ground surface settlement
    Yang S.-S.
    Wang M.
    Du J.-A.
    Guo Y.
    Gen Y.
    Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2020, 54 (09): : 1706 - 1714
  • [7] A New Method for Predicting Ground Settlement Induced by Pipe Jacking Construction
    Niu, Zelin
    Cheng, Yun
    Zhang, Yuwei
    Song, Zhanping
    Yang, Guiyang
    Li, Hui
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2020, 2020
  • [8] Control of settlement due to tunnel construction by slurry pipe jacking method
    Shimada, H
    Khazaei, S
    Matsui, K
    Kawai, T
    Yotsumoto, J
    Mining Science and Technology, 2004, : 377 - 382
  • [9] Ground settlement caused by pipe-roof pre-construction method: Effect of the sequence of jacking pipe groups
    Yang, Song-song
    Zhang, Ding-wen
    Wang, Miao
    Xu, Jing-min
    Shen, Chen
    Zhang, Chao-zhe
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2024, 31 (02) : 576 - 588
  • [10] Influence of steel pipe jacking on earth surface settlement in pipe roof pre-construction method
    Yang, Xian
    Zhang, Ke-Neng
    Li, Zhong
    Deng, Mei-Long
    Xiao, Zun-Qun
    Shenyang Gongye Daxue Xuebao/Journal of Shenyang University of Technology, 2012, 34 (04): : 469 - 473