共 12 条
- [1] Miltenburg G J, Wijngaard J., The U-line line balancing problem[J], Management Science, 40, 10, pp. 1378-1388, (1994)
- [2] Li Z X, Kucukkoc I, Tang Q H., New MILP model and station-oriented ant colony optimization algorithm for balancing U-type assembly lines[J], Computers & Industrial Engineering, 112, pp. 107-121, (2017)
- [3] Li Z X, Kucukkoc I, Zhang Z K., Branch, bound and remember algorithm for U-shaped assembly line balancing problem[J], Computers & Industrial Engineering, 124, pp. 24-35, (2018)
- [4] Babazadeh H, Alavidoost M H, Zarandi M H F, Et al., An enhanced NSGA-II algorithm for fuzzy bi-objective assembly line balancing problems, Computers & Industrial Engineering, 123, pp. 189-208, (2018)
- [5] Fathi M, Alvarez M J, Rodriuez V., A new heuristic-based bi-objective simulated annealing method for U-shaped assembly line balancing, European Journal of Industrial Engineering, 10, 2, pp. 145-169, (2016)
- [6] Aydogan E K, Delice Y, Ozcan U, Et al., Balancing stochastic U-lines using particle swarm optimization, Journal of Intelligent Manufacturing, 30, 1, pp. 97-111, (2019)
- [7] Zheng Qiao-xian, He Guo-liang, Li Ming, Et al., Two stage ant colony optimization for type-2 of U-shaped assembly line balncing problem, Computer Science, 44, 6, pp. 206-211, (2017)
- [8] Tong Yi-chuan, Wu Feng, Heuristic balancing method for U-shaped assembly line, Journal of Nanjing University of Science and Technology, 24, 5, pp. 394-397, (2000)
- [9] Kucukkoc I, Zhang D Z., Balancing of parallel U-shaped assembly lines, Computers & Operations Research, 64, pp. 233-244, (2015)
- [10] Li M, Tang Q H, Zheng Q X, Et al., Rules-based heuristic approach for the U-shaped assembly line balancing problem[J], Applied Mathematical Modeling, 48, pp. 423-439, (2017)