Development height of water-conducting fracture zone in fully-mechanized caving of extra-thick coal seam under strong aquifer

被引:0
|
作者
Liu, Chengyong [1 ,2 ]
Song, Wei [1 ,2 ]
Sheng, Fengtian [1 ,2 ]
Gu, Wenzhe [1 ,2 ]
Yuan, Chaofeng [1 ,2 ]
Zhang, Lei [3 ]
机构
[1] China Coal Energy Research Institute Co., Ltd., Xi'an,710054, China
[2] China Coal Xi'an Design Engineering Co., Ltd., Xi'an,710054, China
[3] Shaanxi Huabin Yadian Coal Industry Co., Ltd., Xianyang,713500, China
关键词
Aquifers - Digital elevation model - Fracture mechanics - Mine roof control - Mine roof supports;
D O I
10.13532/j.jmsce.cn10-1638/td.2024.02.001
中图分类号
学科分类号
摘要
Investigating the height of the water-conducting fracture zone is pivotal for mitigating roof water hazards, particularly under the challenging conditions of fully mechanized top coal caving mining in extra thick coal seams beneath strong aquifers. Set against the backdrop of the ZF1405 working face in the Yadian Coal Mine within the Binchang mining area, this study employed a multifaceted approach. By combining multiple nonlinear regression, numerical simulations, and borehole measurements, it developed a robust predictive model for the fracture zone's height. The findings underscored the significance of considering a wide array of influencing factors to enhance the model's precision, with the predicted height reaching 257.4 m-markedly more accurate than traditional empirical methods suggest. The maximum development height of the water-conducting fracture zone obtained by numerical simulation is 244.2 m. The evolution of the fracture zone was delineated into three distinct stages: a gradual increase observed up to 200 m of working face advancement, followed by a sharp rise between 200 and 280 m, culminating in a stabilization phase beyond 280 meters. This sharp increase phase was particularly prone to roof water inrush incidents, highlighting the need for advanced preventative measures beyond the 200-meter mark. The model's reliability was further corroborated by the convergence of numerical simulation outcomes and borehole observations, which recorded the water-conducting fracture zone heights at 247.4 m and 238.4 m, respectively. Opting for the maximum value of 257.4 m as a conservative estimate, this research provides a solid foundation for predicting the height of water-conducting fracture zones in mines under similar conditions. © 2024 Editorial Office of Journal of Mining and Strata Control Engineering. All rights reserved.
引用
收藏
相关论文
共 50 条
  • [1] Research on the Height of Water Flowing Fractured Zone of Fully Mechanized Caving Mining in Extra-thick Coal Seam
    Feng Shaojie
    Sun Shiguo
    Lv Yuguo
    Lv Ji
    ISMSSE 2011, 2011, 26
  • [2] Numerical Simulation Study on Fully-Mechanized Top Coal Caving in Extra-Thick Coal Seam
    Lei, Wu-lin
    Li, Xingliang
    Chen, Yanfeng
    Duan, Weihua
    Chen, Jianhua
    6TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND CIVIL ENGINEERING, 2020, 455
  • [3] Study on Height Development Characteristics of Water-Conducting Fracture Zone in Fully Mechanized Mining of Shallow Thick Coal Seam under Water
    Chang, Xikun
    Wang, Mingguo
    Zhu, Wei
    Fan, Jinmeng
    Liu, Mingyang
    SUSTAINABILITY, 2023, 15 (09)
  • [4] The Overburden Strata Caving Characteristics and Height Determination of Water Conducting Fracture Zone in Fully Mechanized Caving Mining of Extra Thick Coal Seam
    Ren, Zhicheng
    Wang, Nan
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2020, 38 (01) : 329 - 341
  • [5] The Overburden Strata Caving Characteristics and Height Determination of Water Conducting Fracture Zone in Fully Mechanized Caving Mining of Extra Thick Coal Seam
    Zhicheng Ren
    Nan Wang
    Geotechnical and Geological Engineering, 2020, 38 : 329 - 341
  • [6] Reasonable Width of Segment Pillar of Fully-Mechanized Caving Face in Inclined Extra-Thick Coal Seam
    Fan N.
    Wang J.
    Zhang B.
    Liu D.
    Wang R.
    Geotechnical and Geological Engineering, 2020, 38 (04) : 4189 - 4200
  • [7] Analysis of rib spalling mechanism of fully-mechanized top-coal caving face with great mining height in extra-thick coal seam
    Chang Ju-cai
    Xie Guang-xiang
    Zhang Xue-hui
    ROCK AND SOIL MECHANICS, 2015, 36 (03) : 803 - 808
  • [8] Study of the Evolution of Water-Conducting Fracture Zones in Overlying Rock of a Fully Mechanized Caving Face in Gently Inclined Extra-Thick Coal Seams
    Zhou, Yang
    Yu, Xueyi
    APPLIED SCIENCES-BASEL, 2022, 12 (18):
  • [10] Floor failure law of extra-thick coal seam in fully mechanized caving mining
    Guo G.
    Meitiandizhi Yu Kantan/Coal Geology and Exploration, 2022, 50 (08): : 107 - 115