Multi-objective scheduling for an energy-efficient flexible job shop problem with peak power constraint

被引:1
|
作者
Wang, Jianhua [1 ]
Wu, Chuanyu [1 ]
Peng, Yongtao [1 ]
机构
[1] Jiangsu Univ, Sch Management, Zhenjiang 212013, Jiangsu, Peoples R China
基金
中国国家自然科学基金;
关键词
Flexible job shop scheduling; Peak power constraint; Cluster crossover; Self-adaptive local optimization; Heuristic scheduling rules; PARTICLE SWARM OPTIMIZATION; HARMONY SEARCH ALGORITHM; GENETIC ALGORITHM; CONSUMPTION;
D O I
10.1016/j.asoc.2024.112330
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Controlling electricity costs, which are closely related to the peak power reached, while simultaneously reducing completion time and energy consumption, is crucial for achieving sustainability in the manufacturing industry. However, most existing research on energy-efficient flexible job shop scheduling problems primarily focuses on optimizing completion time and energy consumption, often neglecting the critical aspect of controlling electricity costs. With decreasing resources and increasing energy prices, it is necessary to control electricity costs by limiting the peak power reached during production. To address this gap, this paper investigates an energy-efficient flexible job shop scheduling problem with peak power constraint considering setup and transportation time (EEFJSSP-PPST). We establish a mathematical model for EEFJSSPPPST and propose an improved non-dominated sorting genetic algorithm II (INSGA-II) incorporating several key improvements. We first introduce three scheduling rules in decoding to optimize objectives and employ heuristic rules to generate a high-quality initial population. Then, we propose an innovative cluster crossover method to accelerate convergence and design an adaptive-based local optimization strategy to further enhance performance. Finally, our experiments explore the impacts of different degrees of the peak power constraint on objectives and evaluate the effectiveness of the three scheduling rules. Additionally, the performance of INSGAII is tested using 135 benchmark instances. The results indicate that INSGA-II outperformed its variations without improvements, achieving the best hypervolume (HV) indicator in 80% of the instances and the best inverted generational distance (IGD) indicator in 68.89% of the instances. Compared to other state-of-theart algorithms, INSGA-II achieves the best HV and IGD indicators in 82.2% and 81.5% of the instances, respectively, and demonstrates better convergence and a superior Pareto front. Therefore, we conclude that the improvements in INSGA-II are effective and enhance the algorithm's performance, making it outstanding in solving EEFJSSP-PPST.
引用
收藏
页数:24
相关论文
共 50 条
  • [1] An energy-efficient multi-objective optimization for flexible job-shop scheduling problem
    Mokhtari, Hadi
    Hasani, Aliakbar
    COMPUTERS & CHEMICAL ENGINEERING, 2017, 104 : 339 - 352
  • [2] Multi-objective optimization for energy-efficient flexible job shop scheduling problem with transportation constraints
    Dai Min
    Tang Dunbing
    Adriana, Giret
    Salido Miguel, A.
    ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2019, 59 : 143 - 157
  • [3] Multi-objective genetic algorithm for energy-efficient job shop scheduling
    May, Goekan
    Stahl, Bojan
    Taisch, Marco
    Prabhu, Vittal
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (23) : 7071 - 7089
  • [4] An energy-efficient multi-objective scheduling for flexible job-shop-type remanufacturing system
    Zhang, Wenkang
    Zheng, Yufan
    Ahmad, Rafiq
    JOURNAL OF MANUFACTURING SYSTEMS, 2023, 66 : 211 - 232
  • [5] Multi-objective dual resource constrained flexible Job shop energy-efficient scheduling with transfer time
    Wei, Guangyan
    Ye, Chunming
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2025, 31 (01): : 67 - 88
  • [6] An Enhanced Multi-Objective Evolutionary Algorithm with Reinforcement Learning for Energy-Efficient Scheduling in the Flexible Job Shop
    Shi, Jinfa
    Liu, Wei
    Yang, Jie
    PROCESSES, 2024, 12 (09)
  • [7] Multi-objective Flexible Job Shop Scheduling Problem with Energy Consumption Constraint Using Imperialist Competitive Algorithm
    Guo, Chengzhi
    Lei, Deming
    INTELLIGENT COMPUTING THEORIES AND APPLICATION, PT I, 2018, 10954 : 659 - 669
  • [8] MULTI-OBJECTIVE FLEXIBLE JOB SHOP SCHEDULING PROBLEM WITH CARBON EMISSIONS
    Zhang, Guo-Hui
    Dang, Shi-Jie
    Deng, Xiang
    ENERGY AND MECHANICAL ENGINEERING, 2016, : 946 - 952
  • [9] Multi-objective flexible job shop scheduling problem with key objectives
    Guo, Chengzhi
    Li, Ming
    Lei, Deming
    2019 34RD YOUTH ACADEMIC ANNUAL CONFERENCE OF CHINESE ASSOCIATION OF AUTOMATION (YAC), 2019, : 23 - 27
  • [10] Disruption management of multi-objective flexible job shop scheduling problem
    Sun, Jinghua
    Xu, Li
    Academic Journal of Manufacturing Engineering, 2019, 17 (03): : 50 - 56