共 24 条
- [1] Formation Mechanism of Deep Cracks in the Left Bank Slope of Jinping-I Hydropower Station DISASTER ADVANCES, 2013, 6 (03): : 4 - 11
- [3] Deformation mechanism and stability evaluation for the left abutment slope of Jinping I hydropower station Bulletin of Engineering Geology and the Environment, 2010, 69 : 365 - 372
- [5] Research on influence of left bank slope's long-term deformation on dam body for Jinping I arch dam Liu, Yaoru (liuyaoru@tsinghua.edu.cn), 2016, Academia Sinica (35): : 4040 - 4052
- [7] Study on the mechanism of the deep fractures of the left abutment slope at the Jinping first stage hydropower station Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2002, 24 (05):
- [9] Influence of deep seated discontinuities on the left slope of Jinping I Hydropower Station and its stability analysis Bulletin of Engineering Geology and the Environment, 2010, 69 : 333 - 342