Robust Optimization of Load Restoration Scheme Considering Wind Power Prediction Error Correlation

被引:0
|
作者
Gu X. [1 ]
Zhou G. [1 ]
Li S. [1 ]
Wang P. [1 ]
机构
[1] School of Electrical & Electronic Engineering, North China Electric Power University, Baoding
来源
Dianwang Jishu/Power System Technology | 2021年 / 45卷 / 10期
基金
中国国家自然科学基金;
关键词
Column-and-constraint generation method; Load restoration; Mixed-integer linear programming; Prediction error correlation; Robust optimization;
D O I
10.13335/j.1000-3673.pst.2020.2102
中图分类号
学科分类号
摘要
To deal with the double uncertainty of the source and load during the load restoration process, a robust optimization model is established. The linear-programming approximation of AC power flow (LPAC) is applied to linearize the original model. Then, based on the decoupling idea, the original model is decomposed into a main problem in the prediction scenario and a sub-problem in the error scenarios. The main problem determines the optimal restoration scheme to maximize the weighted load restoration amount. By introducing the slack variables, the scheme verification sub-problem considering the uncertainty of the prediction errors is transformed into an optimization model with a max-min structure. The load forecast error and the wind power forecast error are described by the adjustable box set and the linear polyhedron set respectively. In the solving process, the strong duality theory is used to transform the sub-problem with the max-min structure into the dual model, and the big M method is introduced to linearize the dual model obtained. And then, the column-and-constraint generation algorithm is utilized to efficiently solve the main and sub-problems iteratively. The numerical results of case system verify the effectiveness and feasibility of the proposed model and method. © 2021, Power System Technology Press. All right reserved.
引用
收藏
页码:4092 / 4103
页数:11
相关论文
共 37 条
  • [1] ZENG Hui, SUN Feng, LI Tie, Et al., Analysis of "9•28" blackout in south Australia and its enlightenment to China, Automation of Electric Power Systems, 41, 13, pp. 1-6, (2017)
  • [2] LIU Yun, Analysis on and inspiration of the "9•13" islanding and outage of Brazilian remote northwest power grid, Proceedings of the CSEE, 38, 11, pp. 3204-3213, (2018)
  • [3] CHANG Zhongjiao, LIU Yun, Analysis on and inspiration of the control and protection actions during "0321/March 21" blackout in Brazilian power grid, Power System Technology, 44, 11, pp. 4415-4426, (2020)
  • [4] LIU Yun, Analysis on out-of-step separation in Brazilian power grid and its inspiration, Power System Technology, 43, 4, pp. 1111-1121, (2019)
  • [5] CHEN Guoping, DONG Yu, LIANG Zhifeng, Analysis and reflection on high-quality development of new energy with Chinese characteristics in energy transition, Proceedings of the CSEE, 40, 17, pp. 5493-5506, (2020)
  • [6] WANG Bo, YANG Deyou, CAI Guowei, Review of research on power system inertia related issues in the context of high penetration of renewable power generation, Power System Technology, 44, 8, pp. 2998-3007, (2020)
  • [7] YE Mao, LIU Yan, GU Xueping, Et al., Black-start value evaluation of wind power using a conditional risk method and its application, Power System Technology, 42, 11, pp. 3796-3805, (2018)
  • [8] XIE Yunyun, LIU Changsheng, WU Qiuwei, Et al., Optimized dispatch of wind farms with power control capability for power system restoration, Journal of Modern Power Systems and Clean Energy, 5, 6, pp. 908-916, (2017)
  • [9] GE Rui, DONG Yu, LU Yuechun, Analysis of large-scale blackout in UCTE Power Grid and lessons to be drawn to power grid operation in China, Power System Technology, 31, 3, pp. 1-6, (2007)
  • [10] CHEN Xia, XIN Yanli, TANG Wenhu, Et al., Coordinated control strategy of wind turbine and diesel generator for black-start system of offshore wind farm, Automation of Electric Power Systems, 44, 13, pp. 98-105, (2020)