Validity analysis of flow field method in detecting seepage vector distribution of earth-rock dam

被引:0
|
作者
Dai Q. [1 ,2 ]
Cui Y. [1 ]
Han X. [3 ]
Lei Y. [1 ]
Li J. [1 ]
Zhu Z. [1 ]
机构
[1] School of Geosciences and Info-Physics, Central South University, Changsha
[2] Key Laboratory of Metallogenic Prediction of Nonferrous Metal and Geological Environment Monitoring, Ministry of Education, Changsha
[3] Wuling Power Co. Ltd., Changsha
来源
Cui, Yongsheng (869771506@qq.com) | 1600年 / Science Press卷 / 49期
关键词
Earth-rock dam; Flow field method; Leakage direction; Vector distribution; Vector flow field method;
D O I
10.3969/j.issn.1001-1986.2021.01.030
中图分类号
学科分类号
摘要
Based on the similarity between the electric potential differential control equations of the current field and velocity potential differential control equations of the seepage field, the flow field method(FFM) can not only determine the seepage by measuring the distribution of current field, but also can efficiently figure out the leakage location of the dam. For further discovering the vector distribution and direction of seepage more accurately, the horizontal and vertical potential difference between the upstream and the downstream can be measured to simulate the vector distribution of seepage. In this paper, we illustrate the principle of vector flow field method(VFFM) to simulate the vector distribution of seepage from the aspects of current density, potential differential and absolute value of potential differential. The verification experiment is carried out in a case study of earth-rock dam seepage detection. The results demonstrate that the VFFM can effectively discover the seepage grade and leakage direction. Combined with the results of FFM and VFFM, the proposed method can provide a new solution for detecting the leakage location, seepage grade and leakage direction of earth-rock dam. © 2021 Meitiandizhi Yu Kantan/Coal Geology and Exploration. All rights reserved
引用
收藏
页码:270 / 276
页数:6
相关论文
共 22 条
  • [1] ZHOU Huamin, XIAO Guoqiang, ZHOU Liming, Et al., Geophysical detection technology of hidden embankment troubles: Current research status and prospect, Journal of Yangtze River Scientific Research Institute, 36, 12, pp. 164-168, (2019)
  • [2] HE Jishan, Flow-field method seepage detection technology in embankments, Copper Engineering, 4, pp. 5-8, (1999)
  • [3] ZHANG Hui, YANG Tianchun, Review of non-destructive detection for hidden defects of dams, Dam & Safety, 1, pp. 29-34, (2013)
  • [4] DAI Qianwei, FENG Deshan, WANG Xiaoping, The method to detect the leakage entrance of concrete dam at Gongzui hydro-power station, Journal of Hydroelectric Engineering, 25, 3, pp. 88-90, (2006)
  • [5] DAI Qianwei, ZHANG Bin, FENG Deshan, Et al., Integrated detection of leakage paths in reservoirs by the pseudorandom flow-field method and dual-frequency induced polarization method, Progress in Geophysics, 25, 4, pp. 1453-1458, (2010)
  • [6] SHU Liangang, YANG Wei, HU Qinglong, The application of psuedorandom flow-field method to detecting a dam foundation leakage, Chinese Journal of Engineering Geophysics, 9, 3, pp. 332-336, (2012)
  • [7] DONG Yanpeng, XU Fangquan, WAN Hai, Application of “pseudo-random flow field method” in detection of leakage hidden dangers in levees and dams, Equipment for Geotechnical Engineering, 5, pp. 19-21, (2006)
  • [8] SUN Hongliang, HU Qinglong, SHU Liangang, Study and application of pseudorandom flow-field method for detecting seepage of dyke and dam, Water Resources and Hydropower Engineering, 48, 9, pp. 199-207, (2017)
  • [9] JIAN Chao, SUN Hongliang, Application of pseudo-random flow field fitting method to leakage detection on clay core dam, Chinese Journal of Engineering Geophysics, 17, 3, pp. 373-379, (2020)
  • [10] HE Jishan, Combined application of wide-field electromagnetic method and flow field fitting method for high-resolution exploration: A case study of the Anjialing No.1 Coal Mine, Engineering, 4, pp. 667-675, (2018)