共 50 条
- [1] Calculating Method of Arch Rib Installation Alignment of Large Span Cable Hoisting Arch Bridge INTERNATIONAL CONFERENCE ON SMART TRANSPORTATION AND CITY ENGINEERING 2021, 2021, 12050
- [3] Construction Control Technology of Cable Hoisting System for the Arch Rib of Steel Box Bridge ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 1403 - +
- [4] Integral hoisting technology of arch rib of concrete filled steel tube arch bridge PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 3086 - 3089
- [7] Study on MTMD control of wind-induced vibration for arch steel tower of cable-stayed bridge Zhongguo Tiedao Kexue/China Railway Science, 2013, 34 (01): : 22 - 28
- [8] Construction Control of Hoisting and Installation of Arch Rib of a Half-Through CFST Stiff Skeleton Arch Bridge 1600, Wuhan Bridge Research Institute (47):
- [9] Stability analysis of the super tall tower in the arch rib hoisting construction process PROCEEDINGS OF THE 2015 4TH INTERNATIONAL CONFERENCE ON SENSORS, MEASUREMENT AND INTELLIGENT MATERIALS, 2016, 43 : 537 - 544
- [10] Simulation computation of arch-rib assembling based on cable adjustment for long span CFST arch bridge Advances in Structural Engineering:Theory and Applications Vols 1 and 2, 2006, : 2033 - 2037