Unified modeling and multi-strategy collaborative optimization for satellite task scheduling

被引:0
|
作者
Du Y.-H. [1 ]
Xing L.-N. [1 ]
Chen Y.-G. [1 ]
Xiang S. [1 ]
机构
[1] College of Systems Engineering, National University of Defense Technology, Changsha
来源
Kongzhi yu Juece/Control and Decision | 2019年 / 34卷 / 09期
关键词
Constraint satisfaction; Intelligent optimization method; Multi-strategy collaboration; Satellite task scheduling; Unified modeling;
D O I
10.13195/j.kzyjc.2019.0111
中图分类号
学科分类号
摘要
In current satellite management, each satellite is usually equipped with a special system, and the satellite operation task scheduling and the tracking task scheduling are often separately conducted. This paper analyzes the characteristics of resource occupancy in satellite task scheduling and establishes a unified constraint satisfaction model, which takes satellite onboard independent events and satellite downlink events as scheduling objects, and event executable opportunities as key scheduling resources. With this model, the traditional satellite operation task scheduling and tracking task scheduling are integrated into a unified modeling method. To ensure the generality and adaptability of the model, a multi-strategy collaborative solving framework with heuristic construction, intelligent optimization and specific algorithm improvement is formulated, contributing to a loosely coupled and modular architecture of the satellite task scheduling algorithm and model. Experiment results show that the proposed method can make up for the limitations of traditional models in agile remote sensing satellite scheduling and tracking scheduling of different orbiting satellites, and it has good applicability and optimization effects on Benchmark and practical problems. © 2019, Editorial Office of Control and Decision. All right reserved.
引用
收藏
页码:1847 / 1856
页数:9
相关论文
共 28 条
  • [1] Karapetyan D., Minic S.M., Malladi K.T., Satellite downlink scheduling problem: A case study, Omega, 53, pp. 115-123, (2015)
  • [2] Xiong J., Leus R., Yang Z.Y., Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project, European Journal of Operational Research, 251, 2, pp. 662-675, (2016)
  • [3] Du Y.H., Xing L.N., Chen Y.G., Strategies of maritime cooperative searching and path optimization using multiple platforms, Control and Decision
  • [4] Geng Y.Z., Guo Y.N., Li C.J., Et al., Optimal mission planning with task clustering for staring mode agile satellite, Control and Decision
  • [5] Wu K., Zhang D.X., Chen Z.H., Multi-type multi-objective imaging scheduling method based on improved NSGA-III for satellite formation system, Advances in Space Research, 63, 8, pp. 2551-2565, (2019)
  • [6] Chu X.G., Chen Y.N., Tan Y.J., An anytime branch and bound algorithm for agile earth observation satellite onboard scheduling, Advances in Space Research, 60, 9, pp. 2077-2090, (2017)
  • [7] She Y.C., Li S., Zhao Y.B., Onboard mission planning for agile satellite using modified mixed-integer linear programming, Aerospace Science and Technology, 72, pp. 204-216, (2018)
  • [8] Valicka C.G., Garcia D., Staid A., Mixed-integer programming models for optimal constellation scheduling given cloud cover uncertainty, European Journal of Operational Research, 275, 2, pp. 431-445, (2019)
  • [9] Chen X.Y., Reinelt G., Dai G.M., A mixed integer linear programming model for multi-satellite scheduling, European Journal of Operational Research, 275, 2, pp. 694-707, (2019)
  • [10] Chen H., Li J., Jing N., Scheduling model and algorithms for autonomous electromagnetic detection satellites, Acta Aeronautica et Astronautica Sinica, 31, 5, pp. 1045-1053, (2010)