共 39 条
- [1] Analysis and control of welding deformation in Qinshan Nuclear Power Phase II Extension Project Hedongli Gongcheng/Nuclear Power Engineering, 2010, 31 (06): : 1 - 4
- [2] Design of relief tank for Qinshan Phase II nuclear power project Hedongli Gongcheng/Nuclear Power Engineering, 1999, 20 (05): : 421 - 423
- [3] Application of nuclear safety principle for reactor protection system in QinShan phase II NPP extension project Hedongli Gongcheng/Nuclear Power Engineering, 2009, 30 (SUPPL. 1): : 44 - 47
- [4] Optimization of Thermal Discharge Scheme for the Phase II Project of Rizhao Power Plant 2009 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), VOLS 1-7, 2009, : 2177 - +
- [5] ANALYSIS OF RCS DEPRESSURIZATION EFFECTS ON CONTAINMENT TEMPERATURE FOR QINSHAN PHASE II NUCLEAR POWER PLANT PROCEEDINGS OF THE 22ND INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2014, VOL 3, 2014,
- [6] Outage analysis and maintenance strategy of processing instrument system of Qinshan Nuclear Power Plant II Hedongli Gongcheng/Nuclear Power Engineering, 2015, 36 : 103 - 106
- [7] Design of inadequate core cooling monitoring system in Qinshan phase II extension project Hedongli Gongcheng/Nuclear Power Engineering, 2008, 29 (01): : 5 - 9
- [9] Heat transport system of Qinshan phase III CANDU nuclear power plant Hedongli Gongcheng/Nuclear Power Engineering, 1999, 20 (06): : 496 - 501
- [10] Fuel handling system for Qinshan phase III CANDU nuclear power plant Hedongli Gongcheng/Nuclear Power Engineering, 1999, 20 (06): : 502 - 506