共 50 条
- [2] Construction control of a newly-built subway station undercrossing the existing subway tunnel Zhongguo Tiedao Kexue/China Railway Science, 2009, 30 (01): : 69 - 73
- [3] Influence of existing tunnel on mechanical behavior of new tunnel KSCE Journal of Civil Engineering, 2010, 14 : 773 - 783
- [5] Research on Thermal Stress of Subway Tunnel in Construction Period CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2, 2013, 438-439 : 996 - +
- [6] Study on the interactive dynamic responses between the new-built subway tunnel by blasting construction and the existing operation subway tunnel Zhongguo Tiedao Kexue/China Railway Science, 2011, 32 (05): : 64 - 70
- [9] Construction Plan and Risk Analysis of New Subway Tunnel Passing Beneath Existing Subway Station and Slurry Walls 2015 INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING AND ROCK ENGINEERING, ICCERE 2015, 2015, : 451 - 457
- [10] Numerical Simulation of Lining's Mechanical Behavior in Subway Tunnel ADVANCES IN CIVIL ENGINEERING, PTS 1-4, 2011, 90-93 : 1911 - 1915