Key technologies on the cable harness assembly planning system based on Pro/E

被引:0
|
作者
Nanjing University of Aeronautics and Astronautics, Nanjing 210016, China [1 ]
不详 [2 ]
不详 [3 ]
机构
来源
Zhongguo Jixie Gongcheng | 2008年 / 13卷 / 1565-1569期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:1565 / 1569
相关论文
共 50 条
  • [1] Cable Harness Assembly Planning in Virtual Environment
    LIU JianhuaNING RuxinBAI ShuqingWANG Bile School of Mechanical and Vehicular EngineeringBeijing Institute of TechnologyBeijing ChinaChina Aerospace Science and Industry CorporationBeijing China
    武汉理工大学学报, 2006, (S1) : 355 - 358
  • [2] Architecture of cable harness and tube assembly planning system in virtual environment
    Wan, Bi-Le
    Ning, Ru-Xin
    Liu, Jian-Hua
    Tang, Cheng-Tong
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2007, 13 (08): : 1579 - 1585
  • [3] Representation of Cable Harness for Assembly Sequence Planning
    Zhou, Hang
    Lu, Qi
    Qian, Jinwu
    2022 INTERNATIONAL CONFERENCE ON ADVANCED ROBOTICS AND MECHATRONICS (ICARM 2022), 2022, : 886 - 891
  • [4] Cable harness assembly planning in virtual environment
    Liu Jianhua
    Ning Ruxin
    Bai Shuqing
    Wang Bile
    1st International Symposium on Digital Manufacture, Vols 1-3, 2006, : 355 - 358
  • [5] A Graph-based framework for assembly sequence planning of a cable harness
    Zhou, Hang
    Lu, Qi
    Qian, Jinwu
    JOURNAL OF MANUFACTURING SYSTEMS, 2024, 73 : 39 - 51
  • [6] Cable harness design, assembly and installation planning using immersive virtual reality
    Ritchie J.M.
    Robinson G.
    Day P.N.
    Dewar R.G.
    Sung R.C.W.
    Simmons J.E.L.
    Virtual Reality, 2007, 11 (4) : 261 - 273
  • [7] Virtual Assembly System Based on PRO/E and Topological Relationship
    Song, J. L.
    MANUFACTURING AUTOMATION TECHNOLOGY DEVELOPMENT, 2011, 455 : 6 - 10
  • [8] Physically based real-time interactive assembly simulation of cable harness
    Lv, Naijing
    Liu, Jianhua
    Ding, Xiaoyu
    Liu, Jiashun
    Lin, Haili
    Ma, Jiangtao
    JOURNAL OF MANUFACTURING SYSTEMS, 2017, 43 : 385 - 399
  • [9] SELF-STORING BUILD BOARD SYSTEM FOR AUTOMATED HARNESS-CABLE ASSEMBLY.
    Anon
    IBM technical disclosure bulletin, 1986, 28 (12): : 5607 - 5610
  • [10] Research on Web-based collaborative assembly system and its related key technologies
    Dong, Xing-Hui
    Tong, Bing-Shu
    Gao, Lu
    Luo, Wei
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2003, 9 (01): : 20 - 24