共 15 条
- [1] Changjiang Water Resources Commission of Ministry of Water Resources, Top design report of the study on the joint operation of reservoir group in the Yangtze River basin, pp. 8-9, (2015)
- [2] Changjiang Institute of Survey, Planning, Design and Research, Special report on the selection of normal storage level of Wudongde hydropower station in Jinsha River in the feasibility study stage, pp. 234-251, (2010)
- [3] Changjiang Scientific Research Institute of Changjiang Water Resources Commission, Reservoir sedimentation analysis report of Baihetan hydropower station, pp. 1-42, (2008)
- [4] Chengdu Institute of Survey, Design and Research of State Power Corporation, The feasibility study report of Xiluodu hydropower station in Jinsha River, pp. 191-218, (2001)
- [5] Zhongnan Institute of Survey, Design and Research of State Power Corporation, The feasibility study report of Xiangjiaba hydropower station in Jinsha River, pp. 180-192, (2003)
- [6] Changjiang Water Resources Commission of Ministry of water resources, Preliminary design report of the Three Gorges Project, pp. 33-36, (1992)
- [7] Li D., Mao J., Yang S., Et al., Study on the changing trend of sand to the upper reaches of the Three Gorges Reservoir, pp. 199-264, (2010)
- [8] China Institute of Water Resources and Hydropower Research, Study on the long term impact of the Three Gorges Reservoir, pp. 7-40, (2014)
- [9] Zhao J., Preliminary study of sediment deposition mechanism and operation techniques of cascade reservoirs, pp. 68-99, (2011)
- [10] Huang R., Study on the sediment transport and sediment operation of cascade reservoirs in the upper Changjiang River, pp. 99-144, (2016)