Failure analysis and treatment of temperature detector in main loop for Qinshan phase II NPP

被引:0
|
作者
Wang, Guoqing [1 ]
机构
[1] China Nuclear Power Operations Management Co., Ltd., Haiyan,Zhejiang,314300, China
来源
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Nuclear power plants
引用
收藏
页码:130 / 133
相关论文
共 50 条
  • [1] Design of CRDM for Qinshan phase II NPP project
    Li, Hong-Ying
    Hedongli Gongcheng/Nuclear Power Engineering, 2003, 24 (SUPPL.): : 161 - 164
  • [2] CFD analysis on hydrogen risk in Qinshan II NPP
    Xiong, Jin-Biao
    Yang, Yan-Hua
    Hedongli Gongcheng/Nuclear Power Engineering, 2009, 30 (01): : 8 - 13
  • [3] Severe accident research for Qinshan phase II NPP project
    Shu, Rui
    Xu, Chuan
    Hedongli Gongcheng/Nuclear Power Engineering, 2003, 24 (SUPPL.): : 36 - 39
  • [4] Design of reactor pressure vessel for Qinshan phase II NPP project
    Zhong, Yuan-Zhang
    Wang, Zhen-Quan
    2003, Yuan Zi Neng Chuban She (24):
  • [5] Source terms calculation analysis for the reactor and primary coolant system of Qinshan phase II NPP project
    Zhang, Chuan-Xu
    Hedongli Gongcheng/Nuclear Power Engineering, 2003, 24 (SUPPL.): : 73 - 77
  • [6] Study on beyond design basis accident for Qinshan phase II NPP project
    Jiang, Guang-Ming
    Li, Mei-Fu
    Hedongli Gongcheng/Nuclear Power Engineering, 2003, 24 (SUPPL.): : 44 - 45
  • [7] Instrumentation and control of reactor and coolant system for Qinshan phase II NPP project
    Zhao, Shan-De
    Hedongli Gongcheng/Nuclear Power Engineering, 2003, 24 (SUPPL.): : 227 - 230
  • [8] Design of reactor pressure vessel head package for Qinshan phase II NPP project
    Shen, Xue-Zhu
    Cao, Rui
    Yang, Ke
    Hedongli Gongcheng/Nuclear Power Engineering, 2003, 24 (SUPPL.): : 140 - 142
  • [9] Hydraulics load analyses of design basis accident for Qinshan phase II NPP project
    Yu, Hong-Xing
    Huang, Dai-Shun
    Hedongli Gongcheng/Nuclear Power Engineering, 2003, 24 (SUPPL.): : 102 - 105
  • [10] Control rod drive line cold test research of Qinshan phase II NPP project
    Hu, Jun
    Liu, Shao-Hua
    Jiang, Xian-Guo
    Yang, Lai-Sheng
    Li, Hua-Qi
    Hedongli Gongcheng/Nuclear Power Engineering, 2003, 24 (SUPPL.): : 155 - 157