Dynamical Artificial Bee Colony for Energy-Efficient Unrelated Parallel Machine Scheduling with Additional Resources and Maintenance

被引:0
|
作者
Zhu, Yizhuo [1 ]
He, Shaosi [2 ]
Lei, Deming [2 ]
机构
[1] Hong Kong Univ Sci & Technol, Sch Sci, Hong Kong 999077, Peoples R China
[2] Wuhan Univ Technol, Sch Automat, Wuhan 430070, Peoples R China
来源
CMC-COMPUTERS MATERIALS & CONTINUA | 2024年 / 81卷 / 01期
基金
中国国家自然科学基金;
关键词
Artificial bee colony; parallel machine scheduling; energy; additional resource; GENETIC ALGORITHM; OPTIMIZATION;
D O I
10.32604/cmc.2024.054473
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Unrelated parallel machine scheduling problem (UPMSP) is a typical scheduling one and UPMSP with various real- life constraints such as additional resources has been widely studied; however, UPMSP with additional resources, maintenance, and energy-related objectives is seldom investigated. The Artificial Bee Colony (ABC) algorithm has been successfully applied to various production scheduling problems and demonstrates potential search advantages in solving UPMSP with additional resources, among other factors. In this study, an energy-efficient UPMSP with additional resources and maintenance is considered. A dynamical artificial bee colony (DABC) algorithm is presented to minimize makespan and total energy consumption simultaneously. Three heuristics are applied to produce the initial population. Employed bee swarm and onlooker bee swarm are constructed. Computing resources are shifted from the dominated solutions to non-dominated solutions in each swarm when the given condition is met. Dynamical employed bee phase is implemented by computing resource shifting and solution migration. Computing resource shifting and feedback are used to construct dynamical onlooker bee phase. Computational experiments are conducted on 300 instances from the literature and three comparative algorithms and ABC are compared after parameter settings of all algorithms are given. The computational results demonstrate that the new strategies of DABC are effective and that DABC has promising advantages in solving the considered UPMSP.
引用
收藏
页码:843 / 866
页数:24
相关论文
共 50 条
  • [1] An Artificial Bee Colony with Adaptive Competition for the Unrelated Parallel Machine Scheduling Problem with Additional Resources and Maintenance
    Li, Mingbo
    Xiong, Huan
    Lei, Deming
    SYMMETRY-BASEL, 2022, 14 (07):
  • [2] An adaptive artificial bee colony for unrelated parallel machine schedulingwith additional resource and maintenance
    Lei, Deming
    He, Shaosi
    EXPERT SYSTEMS WITH APPLICATIONS, 2022, 205
  • [3] An artificial bee colony with division for distributed unrelated parallel machine scheduling with preventive maintenance
    Lei, Deming
    Liu, Meiyao
    COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 141
  • [4] New artificial bee colony for distributed unrelated parallel machine scheduling
    Liu M.-Y.
    Lei D.-M.
    Kongzhi Lilun Yu Yingyong/Control Theory and Applications, 2020, 37 (05): : 1080 - 1089
  • [5] An improved artificial bee colony for multi-objective distributed unrelated parallel machine scheduling
    Lei, Deming
    Yuan, Yue
    Cai, Jingcao
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (17) : 5259 - 5271
  • [6] Review on unrelated parallel machine scheduling problem with additional resources
    Abed M.H.
    Kahar M.N.M.
    Iraqi Journal for Computer Science and Mathematics, 2023, 4 (02): : 224 - 237
  • [7] Scheduling unrelated parallel machines with preventive maintenance and setup time: Multi-sub-colony artificial bee colony
    Lei, Deming
    Yang, Hai
    APPLIED SOFT COMPUTING, 2022, 125
  • [8] Scheduling unrelated parallel machines with preventive maintenance and setup time: Multi-sub-colony artificial bee colony
    Lei, Deming
    Yang, Hai
    APPLIED SOFT COMPUTING, 2022, 125
  • [9] Multi-colony artificial bee colony algorithm for multi-objective unrelated parallel machine scheduling problem
    Lei D.-M.
    Yang H.
    Kongzhi yu Juece/Control and Decision, 2022, 37 (05): : 1174 - 1182
  • [10] Algorithms for the Unspecified Unrelated Parallel Machine Scheduling Problem with additional Resources
    Fanjul, Luis
    Perea, Federico
    Ruiz, Ruben
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 69 - 73