Weyerhaeuser plans shutdown of fourth containerboard machine since early 2001

被引:0
|
作者
机构
来源
Pulp and Paper Week | 2002年 / 24卷 / 39期
关键词
Corrugated containers - Costs - Dams - Hydroelectric generators - Plant shutdowns;
D O I
暂无
中图分类号
学科分类号
摘要
Weyerhaeuser plans shutdown of fourth containerboard machine. The company is expected to continue running hydrogenerators at the mill and a dam that provided power for the local power grid. Producers shut higher-cost capacity as part of an effort to more efficiently match supply with demand and avoid oversupply.
引用
收藏
相关论文
共 7 条
  • [3] Academic Practice Plans for Early Career Clinician Investigators The Fourth Pillar of Success
    Bagai, Akshay
    Udell, Jacob A.
    JOURNAL OF THE AMERICAN COLLEGE OF CARDIOLOGY, 2015, 66 (16) : 1839 - 1840
  • [4] The SNS machine protection system: Early commissioning results and future plans
    Sibley, C
    Armstrong, D
    Jones, A
    Justice, A
    Thompson, D
    2005 IEEE PARTICLE ACCELERATOR CONFERENCE (PAC), VOLS 1-4, 2005, : 2030 - 2032
  • [5] Developing Predictive Maintenance for Early Warnings of Machine Failures Using Machine Learning Techniques in the Fourth Industrial Era
    Al Mamlook, Rabia Emhamed
    Obeidat, Muhammad
    Elgeberi, Najat
    Nasayreh, Ahmad
    Frefer, Abdulbaset Ali
    Gharaibeh, Hasan
    Gharaibeh, Tasnim
    Al-Na'amneh, Qais
    4TH INTERDISCIPLINARY CONFERENCE ON ELECTRICS AND COMPUTER, INTCEC 2024, 2024,
  • [6] SCORING AND PREDICTION OF EARLY RETIREMENT USING MACHINE LEARNING TECHNIQUES: APPLICATION TO PRIVATE PENSION PLANS
    Salazar, Jose de Jesus Rocha
    Boado-Penas, Maria del Carmen
    ANALES DEL INSTITUTO DE ACTUARIOS ESPANOLES, 2019, (25): : 119 - 145
  • [7] Origin of the left ventricular vent during the early years of open-heart surgery with the Gibbon heart-lung machine (vol 28, pg 292, 2001)
    Hedlund, KD
    TEXAS HEART INSTITUTE JOURNAL, 2004, 31 (01) : 107 - 108