Reliability of the rotors of the T-250/300-23.5 turbines of TMZ under cyclic unloading and loading with initial sliding live-steam pressure conditions

被引:0
|
作者
Trukhnii, A.D. [1 ]
Lomakin, B.V. [1 ]
Lunin, A.P. [1 ]
机构
[1] Moscow Power Institute (MEI), ul. Krasnokazarmennaya 14, Moscow 111250, Russia
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:444 / 453
相关论文
共 4 条
  • [1] Heat flow diagrams with and without a deaerator for steam turbine plants with T-250/300-23.5 turbines
    Valamin A.E.
    Kultyshev A.Y.
    Shibaev T.L.
    Gol’dberg A.A.
    Stepanov M.Y.
    Thermal Engineering, 2016, 63 (11) : 777 - 780
  • [2] Problems of automation of T-250 power units unloading under sliding steam pressure conditions
    Arakelyan, E.K.
    Pan'ko, M.A.
    Makarch'yan, V.A.
    Tsypin, A.V.
    Thermal Engineering, 2005, 52 (10) : 795 - 799
  • [3] LOW-FLOW-RATE OPERATING MODES AND THE RELIABILITY OF THE LOW-PRESSURE CYLINDER OF THE T-250/300-23.5 TURBINE
    KHAIMOV, VA
    KHRABROV, PV
    VOROPAEV, YA
    KOTLYAR, OE
    THERMAL ENGINEERING, 1991, 38 (11) : 594 - 599
  • [4] On the Issue of Unloading Supercritical Steam Pressure Units Used in T-250/300-240 Cogeneration Steam Turbines
    Lenev S.N.
    Moskvin K.V.
    Radin Y.A.
    Khaneev K.V.
    Power Technology and Engineering, 2023, 56 (06) : 883 - 888