共 50 条
- [3] A joint GA+DP approach for single burn-in oven scheduling problems with makespan criterion The International Journal of Advanced Manufacturing Technology, 2007, 35 : 587 - 595
- [4] A joint GA plus DP approach for single burn-in oven scheduling problems with makespan criterion INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2007, 35 (5-6): : 587 - 595
- [6] Minimizing earliness–tardiness on a single burn-in oven with a common due date and maximum allowable tardiness constraint OR Spectrum, 2006, 28 : 177 - 198
- [7] MINIMIZING POWER-SUPPLY DISTURBANCES DURING SEMICONDUCTOR BURN-IN EE-EVALUATION ENGINEERING, 1995, 34 (03): : 151 - 152
- [9] Optimal burn-in for minimizing cost and multiobjectives MICROELECTRONICS AND RELIABILITY, 1998, 38 (10): : 1577 - 1583