Advance of transport tunnel engineering and construction technique in china

被引:0
|
作者
Xi, Zhong-Wei [1 ]
机构
[1] Zhongtie 15th Bureau Group Limited Company, Luoyang 471013, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
16
引用
收藏
页码:141 / 146
相关论文
共 50 条
  • [1] TUNNEL CONSTRUCTION TECHNIQUE
    不详
    COMPRESSED AIR, 1969, 74 (08): : 20 - &
  • [3] The Analysis of the Tunnel Engineering Construction Supervision
    Bo-Yun, Zhou
    Ji-Wei, Wang
    Yong-Liang, Wu
    CIVIL ENGINEERING IN CHINA - CURRENT PRACTICE AND RESEARCH REPORT: PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING, 2011, : 106 - 108
  • [4] Sophiaspoortunnel -: tunnel technique and development of the continuous advance method
    Bäppler, K
    Jonker, JH
    (RE)CLAIMING THE UNDERGROUND SPACE, VOLS 1 AND 2, PROCEEDINGS, 2003, : 951 - 955
  • [5] Engineering a de Novo Transport Tunnel
    Brezovsky, Jan
    Babkova, Petra
    Degtjarik, Oksana
    Fortova, Andrea
    Gora, Artur
    Iermak, Iuliia
    Rezacova, Pavlina
    Dvorak, Pavel
    Smatanova, Ivana Kuta
    Prokop, Zbynek
    Chaloupkova, Radka
    Damborsky, Jiri
    ACS CATALYSIS, 2016, 6 (11): : 7597 - 7610
  • [6] Application of advance geological forecast technology (HSP) in tunnel construction
    Hu, Y. (871380087@qq.com), 1600, China Railway Southwest Research Institute Co. Ltd., No.97 Gunan Street, West Hi-Tech Zone, Chengdu, 611731, China (50):
  • [7] TUNNEL ADVANCE RATE PREDICTION BASED ON GEOLOGIC AND ENGINEERING OBSERVATIONS
    GENTRY, DW
    KENDORSK.FS
    ABEL, JF
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 1971, 8 (05): : 451 - &
  • [8] Construction of Zhoutouzui Immersed Tunnel in China
    Chen, Hongjuan
    Yan, Weiming
    Chen, Shicai
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING, PTS 1-4, 2013, 353-356 : 1657 - 1661
  • [9] Study of the stability of tunnel construction based on double-heading advance construction method
    Song, Zhanping
    Shi, Guilin
    Zhao, Baoyun
    Zhao, Keming
    Wang, Junbao
    ADVANCES IN MECHANICAL ENGINEERING, 2020, 12 (01)
  • [10] Construction of an advance tunnel for the Deep Tunnel Sewerage System (DTSS) using sprayed concrete linings
    Nair, RS
    Deutscher, MS
    Tham, KS
    McChesney, SA
    TUNNELS AND UNDERGROUND STRUCTURES, 2000, : 227 - 234