Intelligent rescheduling optimization method of high-speed railway based on deep reinforcement learning DDDQN

被引:0
|
作者
Wu W. [1 ]
Yin J. [2 ]
Chen Z. [2 ]
Tang T. [2 ]
机构
[1] Beijing HollySys Co., Ltd, Beijing
[2] State Key Laboratory of Rail Traffic Control and Safety, Beijing Jiaotong University, Beijing
关键词
deep reinforcement learning; integer programming; intelligent train rescheduling; neural network; train delay time;
D O I
10.19713/j.cnki.43-1423/u.T20230864
中图分类号
学科分类号
摘要
In the daily operation of the high-speed railway system, trains are often disturbed by various emergencies leading to delays, which seriously affects passengers ’ travel experience. In order to work out train rescheduling scheme in a short time and reduce train delay time as much as possible, a train rescheduling optimization method DDDQN combining deep reinforcement learning and an programming model was proposed. First, the track was divided into multiple sections connected. An integer programming model was constructed to describe the train operation process to minimize the total delay time of all trains based on the job-shop scheduling problem. Then, each train was regarded as an agent, and the state, action and reward functions of multiple agents were defined according to the actual operation requirements. Two deep neural networks were constructed to approximate the functions. Finally, combined with the above integer programming model, the training method of DDDQN was designed. In this model, the feasible solution to the problem was explored by the agent in the simulation environment, and the parameters of the neural network were updated by the “mutual feed” mechanism between the two neural networks. On this basis, the optimal solution to the problem can be obtained in a short time by solving the integer programming model. The actual track data and operation data of the Beijing-Zhangjiakou high-speed railway were used for simulation experiments, and the total train delay time and solution time obtained by three different solution methods under 10 different emergency scenarios were compared, which verified that the proposed DDDQN model could obtain the optimal solution of the problem in a short time. DDDQN can reduce train delay time by up to 30.43% and solution time by up to 68.33%. DDDQN provides an intelligent method and reference for improving the emergency handling ability and transportation organization efficiency of high-speed railway systems under emergencies. © 2024, Central South University Press. All rights reserved.
引用
收藏
页码:1298 / 1308
页数:10
相关论文
共 21 条
  • [1] ZHANG Hongjie, FENG Xiaofang, KONG Qingwei, Design of intelligent integrated traffic control system for Beijing-Zhangjiakou HSR[J], China Railway, 4, (2022)
  • [2] LIU Changqing, Research and application of key technologies of intelligent EMU trains of Beijing-Zhangjiakou HSR[J], China Railway, 9, (2019)
  • [3] MASCIS A, PACCIARELLI D., Job-shop scheduling with blocking and no-wait constraints, European Journal of Operational Research, 143, 3, (2002)
  • [4] XU Peijuan, ZHANG Dawei, PENG Hui, Et al., Trains rescheduling for high-speed railway under the influence of multi-disturbances[J], Journal of Railway Science and Engineering, 18, 7, (2021)
  • [5] ZHAN Shuguang, ZHAO Jun, PENG Qiyuan, Real-time train rescheduling on high-speed railway under partial segment blockages[J], Journal of the China Railway Society, 38, 10, (2016)
  • [6] WANG Yinan, MENG Lingyun, TANG Jiatong, Et al., Optimization model of high-speed railway train rescheduling for over-zone feeding[J], Journal of Railway Science and Engineering, 18, 9, (2021)
  • [7] Sairong Peng, Study on the train rescheduling and speed control problem in case of decreased traffic capacity on one-side railway track[D], pp. 61-74, (2021)
  • [8] XU Peijuan, CORMAN F, PENG Qiyuan, Et al., A train rescheduling model integrating speed management during disruptions of high-speed traffic under a quasi-moving block system[J], Transportation Research Part B: Methodological, 104, (2017)
  • [9] MENG Xuelei, CHENG Xiaoqing, GAO Ruhu, Et al., High-speed train rescheduling under circumstance of infectious epidemic emergency[J], Journal of Railway Science and Engineering, 20, 4, (2023)
  • [10] D'ARIANO A, PACCIARELLI D, PRANZO M., A branch and bound algorithm for scheduling trains in a railway network[J], European Journal of Operational Research, 183, 2, (2007)