共 9 条
- [1] Managing risk and contractual liability. Part 10: Certification Structural Engineer, 2015, 93 (10): : 25 - 27
- [2] Managing risk and contractual liability. Part 5: Communication Structural Engineer, 2015, 93 (05): : 38 - 39
- [3] Managing risk and contractual liability. Part 7: Understanding contractual terms Struct. Eng., 7 (34-36):
- [4] Managing risk and contractual liability. Part 3: Scope of work Structural Engineer, 2015, 93 (03): : 32 - 33
- [5] Managing risk and contractual liability. Part 8: Indemnity clauses Structural Engineer, 2015, 93 (08): : 24 - 25
- [6] Managing risk and contractual liability. Part 11: Net contribution and limitations of liability Struct. Eng., 11 (24-26):
- [7] Rethinking the Price Formation Problem-Part 2: Rewarding Flexibility and Managing Price Risk IEEE Transactions on Energy Markets, Policy and Regulation, 2023, 1 (04): : 490 - 498
- [9] Introducing the ATOM risk management methodology for managing risks in heavy subway projects - The middle section of the Tehran Metro L6 and Tehran-Eslamshahr subway phase 1 PROCEEDINGS OF THE ITA-AITES WORLD TUNNEL CONGRESS 2023, WTC 2023: Expanding Underground-Knowledge and Passion to Make a Positive Impact on the World, 2023, : 3437 - 3444