Mathematical modelling for process design of walking worker assembly line in productivity and ergonomics perspectives

被引:0
|
作者
Al-Zuheri, Atiya [1 ]
Xing, Ke [1 ]
Luong, Lee [1 ]
机构
[1] School of Advanced Manufacturing and Mechanical Engineering, Division of Information Technology, Engineering and the Environment, University of South Australia, Mawson Lakes, SA 5095, Australia
关键词
Productivity;
D O I
10.1504/IJISE.2013.052923
中图分类号
学科分类号
摘要
引用
收藏
页码:104 / 137
相关论文
共 50 条
  • [1] A study of in-process waiting time on a linear walking worker assembly line
    Lassalle, S.
    Wang, Q.
    Owen, G. W.
    Mileham, A. R.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2007, 221 (12) : 1763 - 1770
  • [2] A mathematical programming approach for walking-worker assembly systems
    Cevikcan, Emre
    ASSEMBLY AUTOMATION, 2014, 34 (01) : 56 - 68
  • [3] The effects of using a structured ergonomics design review process in the development of an assembly line
    Wick, JL
    McKinnis, M
    ADVANCES IN OCCUPATIONAL ERGONOMICS AND SAFETY, VOL 2, 1998, 2 : 143 - 146
  • [4] Cobotic Assembly Line Design Problem with Ergonomics
    Abdous, Mohammed-Amine
    Delorme, Xavier
    Battini, Daria
    BOOSTING COLLABORATIVE NETWORKS 4.0: 21ST IFIP WG 5.5 WORKING CONFERENCE ON VIRTUAL ENTERPRISES, PRO-VE 2020, 2021, 598 : 573 - 582
  • [5] The effects of worker learning, forgetting, and heterogeneity on assembly line productivity
    Shafer, SM
    Nembhard, DA
    Uzumeri, MV
    MANAGEMENT SCIENCE, 2001, 47 (12) : 1639 - 1653
  • [6] An Integrated Design Support Methodology for Walking Worker Assembly Lines
    Alzuheri, Atiya
    Luong, Lee
    Xing, Ke
    INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTISTS (IMECS 2010), VOLS I-III, 2010, : 1612 - 1617
  • [7] New methodological framework to improve productivity and ergonomics in assembly system design
    Battini, D.
    Faccio, M.
    Persona, A.
    Sgarbossa, F.
    INTERNATIONAL JOURNAL OF INDUSTRIAL ERGONOMICS, 2011, 41 (01) : 30 - 42
  • [8] Determining numbers of workstations and operators for a linear walking-worker assembly line
    Wang, Q.
    Owen, G. W.
    Mileham, A. R.
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2007, 20 (01) : 1 - 10
  • [9] Fatigue recovery mathematical modelling for increasing productivity of a medium-workload worker in Indonesia
    Soenandi, Iwan Aang
    Ardian, Vincent
    TARUMANAGARA INTERNATIONAL CONFERENCE ON THE APPLICATIONS OF TECHNOLOGY AND ENGINEERING, 2019, 508
  • [10] THE IMPACT OF WALKING TIME ON U-SHAPED ASSEMBLY LINE WORKER ALLOCATION PROBLEMS
    Sirovetnukul, Ronnachai
    Chutima, Parames
    ENGINEERING JOURNAL-THAILAND, 2010, 14 (02): : 53 - 78