共 49 条
- [1] Dam concrete temperature control for TGP's stage II works Renmin Changjiang/Yangtze River, 2001, 32 (10): : 18 - 19
- [2] Spatial elastoplastic analysis of reinforcing outlets in flood release dam section of TGP Renmin Changjiang/Yangtze River, 2001, 32 (04): : 9 - 11
- [3] Max. concrete temperature control technology for Stage II works of TGP Renmin Changjiang/Yangtze River, 2001, 32 (09): : 13 - 15
- [5] Comparison of concrete mixing plants for stage II works of TGP 2001, Yangtze River Scientific Research Institute (32):
- [6] Influence of backwater of TGP's Stage II cofferdam on flood discharging Renmin Changjiang/Yangtze River, 2002, 33 (01):
- [7] Study on new technology in stage II works construction of TGP and application Renmin Changjiang/Yangtze River, 2002, 33 (10):
- [8] Practice of construction safety supervision on the stage I and II B bidding works of TGP Renmin Changjiang/Yangtze River, 2002, 33 (10):
- [9] Review of commercial management for TGP Stage II works' 1&2B contracts Renmin Changjiang/Yangtze River, 2000, 31 (07): : 4 - 5
- [10] Study on thermal stress control for left guide-wall dam section of TGP by numerical simulation method Changjiang Kexueyuan Yuanbao/ Journal of Yangtze River Scientific Research Institute, 2001, 18 (04): : 22 - 25