Application of pile bottom post-grouting technology to increase the bearing capacity of bored piles in Vietnam

被引:0
|
作者
Tung, Nguyen Khanh [1 ,2 ]
Li, Wu [1 ]
机构
[1] Faculty of Engineering, China University of Geosciences, Wuhan, China
[2] FECON Underground Construction, JSC, United States
来源
关键词
Grouting - Load testing - Mortar - Concrete construction - Bearing capacity - Cost engineering - Gold;
D O I
暂无
中图分类号
学科分类号
摘要
The bored pile is a chief type of foundations used in high buildings and long span bridges. Unfortunately, some drawbacks such as sedimentation on the bottom of piles and mud around the shaft arise from traditional construction technology of bored pile. With the use of pile bottom post-grouting which is an excellent technology due to its upgrading the behavior of bored pile and saving the engineering costs drastically, those disadvantages will be overcome. The earliest application of this technology may be in 1958 to the Maracaibo Bridge, Venezuela. In Vietnam, the application technology for the first time in My Thuan bridge (1998) located in Tien Giang province by Australia contractor. In recent ten years, about 50 bridge and high building projects in Vietnam had successfully application of this technology. This paper introduces advantages, applications and construction process of pile bottom post-grouting technology. Combined with case study, summarized and analyzed engineering geological conditions, static load testing pile result and researched on effect of this technology. © 2015 ejge.
引用
收藏
页码:6629 / 6639
相关论文
共 50 条
  • [1] Post-grouting bored pile technology
    Zheng, A. R.
    3RD INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING, 2017, 61
  • [2] Application and Construction Technology of Post-Grouting Bored Pile
    Fang, Pengfei
    Zhang, Hang
    Kong, Qinghua
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1-3, 2010, : 737 - 740
  • [3] The technology and application of post-grouting for slurry bored piles
    Liu, JL
    Zhu, ZC
    Zhang, Y
    FOURTEENTH INTERNATIONAL CONFERENCE ON SOIL MECHANICS AND FOUNDATION ENGINEERING, VOL 2, 1997, : 831 - 834
  • [4] Research on Bearing Capacity of Post-grouting Super-long Bored Pile
    Ma, Hailong
    Ma, Yufei
    Yao, Wenhong
    Chen, Chi
    2020 2ND INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING, ENVIRONMENT RESOURCES AND ENERGY MATERIALS, 2021, 634
  • [5] Evaluation on Bearing Capacity Improvement of Cast-in-situ Bored piles Using Post-grouting Technology
    Cai, Jing
    Wang, Yongyu
    Wang, Xinghua
    Yan, Huawei
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 168 - 172
  • [6] Experiment research on bored pile with post-grouting technology
    Cheng, Ruichao
    Yu, Xin
    CIVIL, STRUCTURAL AND ENVIRONMENTAL ENGINEERING, PTS 1-4, 2014, 838-841 : 854 - 857
  • [7] Numerical analysis on the bearing capacity of post-grouting bored pile under vertical load
    Huang, Ji-Long
    J.-J., Chen
    J.-H., Wang
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2006, 40 (12): : 2122 - 2125
  • [8] Bearing capacity of post-grouting pile foundation
    School of Highway, Chang'an University, Xi'an 710064, China
    Chang'an Daxue Xuebao, 2006, 3 (35-38):
  • [9] Research on the Influence Factors of Post-grouting Bored Piles Load-bearing Capacity
    Gao, Jianbin
    Liu, Yunxia
    Ren, Gaojie
    Li, Qingfu
    PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON ARCHITECTURAL ENGINEERING AND CIVIL ENGINEERING, 2016, 72 : 340 - 343
  • [10] Post-Grouting of Long Bored Piles in Clay
    Tan, Yong
    Lu, Ye
    Peng, Fangle
    Liao, Shaoming
    GROUTING 2017: CASE HISTORIES, 2017, (287): : 338 - 347