Responses of channel migration to changes of flow and sediment regime in the Jingjiang reach of the middle Yangtze River: II: Differences between upper and lower sections

被引:0
|
作者
State Key Laboratory of Hydrology-Water Resources and Hydraulic Engineering, Nanjing Hydraulic Research Institute, Nanjing 210029, China [1 ]
不详 [2 ]
不详 [3 ]
机构
[1] [1,Jia, Dongdong
[2] Shao, Xuejun
[3] Jiang, Haifeng
[4] Shen, Yang
[5] Zhang, Xingnong
[6] Shang, Yizi
来源
Jia, D. (jiadongdong@tsinghua.org.cn) | 1600年 / International Research and Training Center on Erosion and Sedimentation and China Water and Power Press卷 / 24期
关键词
7;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 9 条
  • [1] Impacts of the Flow and Sediment Regime Changes on Morphological Changes in the Shishou Reach of the Middle Yangtze River
    Jia, Dongdong
    Shao, Xuejun
    Shen, Yang
    Jiang, Haifeng
    PROCEEDINGS OF THE 35TH IAHR WORLD CONGRESS, VOLS I AND II, 2013, : 4992 - 4997
  • [2] Responses of channel morphology to flow-sediment variations after dam construction: a case study of the Shashi Reach, middle Yangtze River
    Chen, Fan
    Chen, Li
    Zhang, Wei
    Han, Jiandiao
    Wang, Junzhou
    HYDROLOGY RESEARCH, 2019, 50 (05): : 1359 - 1375
  • [3] Response of sediment delivery ratio to the incoming flow-sediment regime and channel geometry in the braided reach of the Lower Yellow River
    Cheng Y.
    Xia J.
    Zhou M.
    Wang Y.
    Dili Xuebao/Acta Geographica Sinica, 2021, 76 (01): : 127 - 138
  • [4] Response of reach-scale bankfull channel geometry to the altered flow and sediment regime in the lower Yellow River
    Xia, Junqiang
    Li, Xiaojuan
    Li, Tao
    Zhang, Xiaolei
    Zong, Quanli
    GEOMORPHOLOGY, 2014, 213 : 255 - 265
  • [5] Responses of river bed evolution to flow-sediment process changes after Three Gorges Project in middle Yangtze River: A case study of Yaojian reach
    Zuo, Li-qin
    Lu, Yong-jun
    Liu, Huai-xiang
    Ren, Fang-fang
    Sun, Yuan-yuan
    WATER SCIENCE AND ENGINEERING, 2020, 13 (02) : 124 - 135
  • [6] Responses of river bed evolution to flow-sediment process changes after Three Gorges Project in middle Yangtze River: A case study of Yaojian reach
    Li-qin Zuo
    Yong-jun Lu
    Huai-xiang Liu
    Fang-fang Ren
    Yuan-yuan Sun
    Water Science and Engineering, 2020, 13 (02) : 124 - 135
  • [7] Response of flood discharge capacity to the incoming flow and sediment regime and channel geometry in the braided reach of the Lower Yellow River
    Cheng Y.
    Xia J.
    Zhou M.
    Deng S.
    Shuikexue Jinzhan/Advances in Water Science, 2020, 31 (03): : 337 - 347
  • [8] Complex channel responses to changes in stream flow and sediment supply on the lower Duchesne River, Utah
    Gaeuman, D
    Schmidt, JC
    Wilcock, PR
    GEOMORPHOLOGY, 2005, 64 (3-4) : 185 - 206
  • [9] Relationship between the characteristics of water-sediment transportation in river-lake system and the channel forming discharge of the middle and lower Yangtze River
    Sun Z.
    Zhou W.
    Zhou K.
    Zhou X.
    Chen L.
    Li Y.
    Shuili Xuebao/Journal of Hydraulic Engineering, 2021, 52 (05): : 521 - 534