共 50 条
- [1] SELECTION OF TEST LOAD FOR LOAD-LIFTING CRANES RUSSIAN ENGINEERING JOURNAL, 1980, 60 (04): : 34 - 37
- [2] Recorders of parameters of operation of load-lifting cranes Bezopasnost' Truda v Promyshlennosti, 2001, (04): : 60 - 63
- [3] Ordering of works during erection of load-lifting cranes 2002, Promyshlennaya Bezopasnost' (NTTs)
- [4] Application of electric drive with frequency control at load-lifting cranes Bezopasnost' Truda v Promyshlennosti, 2005, (08): : 6 - 9
- [5] DYNAMICS OF GANTRY CRANES DURING OPERATION OF LOAD-LIFTING MECHANISM RUSSIAN ENGINEERING JOURNAL, 1974, 54 (12): : 12 - 16
- [6] Qualitative performing of technical examination of load-lifting cranes is efficient factor of their emergency-free operation Bezopasnost' Truda v Promyshlennosti, 2001, (10): : 2 - 6
- [7] The construction of the system of automation of designing of load-lifting cranes of bridge type INTERNATIONAL SCIENTIFIC CONFERENCE ON APPLIED PHYSICS, INFORMATION TECHNOLOGIES AND ENGINEERING (APITECH-2019), 2019, 1399
- [8] Evaluation of residual service life of metallic structures of load-lifting cranes Bezopasnost' Truda v Promyshlennosti, 2002, (10): : 30 - 32
- [9] Importance of defect detection in ropes for improving the safety of operation of load-lifting cranes Bezopasnost' Truda v Promyshlennosti, 2002, (09): : 15 - 20
- [10] Standardization of the load-lifting machine designs Montazhnye i Spetsial'nye Raboty v Stroitel'stve, 2001, (04): : 16 - 17