Introducing back-up to active compressor surge control system

被引:0
|
作者
Engineering Cybernetics, Norwegian University for Science and Technology, O.S. Bragstads plass 2D, Trondheim, N-7491, Norway [1 ]
机构
来源
IFAC Proc. Vol. (IFAC-PapersOnline) | 1600年 / PART 1卷 / 263-268期
关键词
D O I
May 31, 2012 - June 1, 2012
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Implementing back-up control centers
    Skopp, AR
    2002 IEEE POWER ENGINEERING SOCIETY SUMMER MEETING, VOLS 1-3, CONFERENCE PROCEEDINGS, 2002, : 374 - 374
  • [2] Back-up
    Geodrilling (Brentwood, Engl), 1992, (71):
  • [3] Back-up
    Geodrilling (Brentwood, Engl), 1991, (69):
  • [4] Back-up
    1600, (02):
  • [5] Control of Compressor Surge with Active Magnetic Bearings
    Yoon, Se Young
    Lin, Zongli
    Goyne, Chris
    Allaire, Paul E.
    49TH IEEE CONFERENCE ON DECISION AND CONTROL (CDC), 2010, : 4323 - 4328
  • [6] Solar Thermoelectric System with Biomass Back-up
    Goncalves, Jose Teixeira
    Camus, Cristina Ines
    Valtchev, Stanimir Stoyanov
    TECHNICAL INNOVATION FOR SMART SYSTEMS (DOCEIS 2017), 2017, 499 : 358 - 369
  • [7] CONSIDERATIONS RELATIVE TO A BACK-UP SYSTEM.
    Clauzon, P.
    Marmonier, P.
    Heine, A.Meyer
    Ladet, J.
    Cachera, P.
    Delemontey, J.
    1974, : 1370 - 1378
  • [8] Service & back-up
    Metalworking Production, 1997, 141 (09): : 109 - 110
  • [9] Back-up Mom
    Furlong, Janice
    PLOUGHSHARES, 2024, 50 (02)
  • [10] Call for back-up!
    Evans-Pughe C.
    Engineering and Technology, 2011, 6 (01): : 74 - 77