Controlling early-age temperature variations in concrete bridge decks

被引:0
|
作者
20153701272621
机构
来源
(1) Department of Civil and Environmental Engineering, University of California, Davis, United States; (2) Earth Sciences Division, Lawrence Berkeley National Laboratory, Berkeley; CA, United States | 1600年 / et al; Faculty of Science and Engineering, Waseda University, Japan; The Kajima Foundation, Japan; The Maeda Engineering Foundation, Japan; The Obayashi Foundation, Japan; Tokyo Metropolitan Government, Japan卷 / CRC Press/Balkema期
关键词
The early-age cracking of concrete bridge decks continues to be a major concern; particularly when the concrete mixture design is based on high cementitious materials content or when deck casting/curing is done in unfavorable conditions. Temperature differences between the freshly cast deck and the supporting girders are one potential contributor to early-age cracking. Such cracking can strongly affect the durability of the bridge deck and therefore the maintenance schedule and life-cycle cost of the bridge. This paper presents numerical modeling of temperature development in freshly cast bridge decks; as it depends on heat of hydration and environmental factors. Model validation is accomplished through comparisons with temperatures measured within instrumented bridge decks. The validated models are used for parametric study that examines the effects of cementitious materials content; time of casting; mixture temperature at the time of casting; and degree of solar heating during the first several days after casting. The results demonstrate the potential for evaluating the likelihood of early-age cracking by computationally linking relevant aspects of materials design; structural design; and methods of processing. © 2015 Taylor & Francis Group; London;
D O I
暂无
中图分类号
学科分类号
摘要
123649
引用
收藏
相关论文
共 50 条
  • [1] Controlling early-age temperature variations in concrete bridge decks
    Bolander, J. E.
    Kim, K.
    LIFE-CYCLE OF STRUCTURAL SYSTEMS: DESIGN, ASSESSMENT, MAINTENANCE AND MANAGEMENT, 2015, : 470 - 476
  • [2] Identification of Early-Age Cracking in Concrete Bridge Decks
    Subramaniam, Kolluru V. L.
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2016, 30 (06)
  • [3] Limiting Early-Age Cracking in Concrete Bridge Decks
    ElSafty, Adel
    Abdel-Mohti, Ahmed
    Jackson, Mike
    Lasa, Ivan
    Paredes, Mario
    ADVANCES IN CIVIL ENGINEERING MATERIALS, 2013, 2 (01): : 379 - 399
  • [4] Thermal effects on early-age cracking potential of concrete bridge decks
    Bolander, J. E.
    Kim, K.
    Sasaki, K.
    COMPUTATIONAL MODELLING OF CONCRETE STRUCTURES, VOL 2, 2014, : 723 - 729
  • [5] Early-Age Cracking in High Performance Concrete Decks of a Curved Steel Girder Bridge
    Xia, Ye
    Nassif, Hani
    Su, Dan
    JOURNAL OF AEROSPACE ENGINEERING, 2017, 30 (02)
  • [6] Temperature and relative humidity analysis in early-age concrete decks of composite bridges
    Oh, B. H.
    Choi, S. C.
    Cha, S. W.
    MEASURING, MONITORING AND MODELING CONCRETE PROPERTIES, 2006, : 305 - +
  • [7] EARLY-AGE RESPONSE OF CONCRETE PAVEMENTS TO TEMPERATURE AND MOISTURE VARIATIONS
    Kim, Sunghwan
    Gopalakrishnan, Kasthurirangan
    Ceylan, Hall
    Wang, Kejin
    BALTIC JOURNAL OF ROAD AND BRIDGE ENGINEERING, 2010, 5 (03): : 132 - 138
  • [8] Early age cracking of reinforced concrete bridge decks
    William, Gergis W.
    Shoukry, Samir N.
    Riad, Mourad Y.
    BRIDGE STRUCTURES, 2005, 1 (04) : 379 - 396
  • [9] Use of glass and nylon fibers in concrete for controlling early age micro cracking in bridge decks
    Khan, Mehran
    Ali, Majid
    CONSTRUCTION AND BUILDING MATERIALS, 2016, 125 : 800 - 808
  • [10] Early-age cracking in reconstructed concrete bridge barrier walls
    Cusson, D
    Repette, WL
    ACI MATERIALS JOURNAL, 2000, 97 (04) : 438 - 446