Numerical simulation of excavation of deep foundation pit adjacent to metro station based on FLAC3D

被引:0
|
作者
Ren, Wei-Ming [1 ]
Peng, Li-Yun [1 ]
Liu, Jun [1 ]
机构
[1] Beijing University of Civil Engineering and Architecture, Beijing 100044, China
关键词
The excavation of deep foundation pit adjacent to the existing metro station structure is a project with great source of risk. The existing structure will inevitably be influenced by the excavation. Based on one example of excavation work close to a metro station in Beijing; the influence of excavation on metro station is studied by FLAC3D stimulation. The method for simulating pile-anchor retaining and deformation joints is proposed; at the same time it is very useful to the numerical simulation of foundation pit. Finally; some deformation rules are concluded; and specific measures are put forward;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:276 / 280
相关论文
共 50 条
  • [1] Numerical Simulation Analysis with FLAC3D on Retrofitting and Strengthening of Existing Deep Foundation pit
    Xu, Houcai
    Xu, Houcai
    2015 SEVENTH INTERNATIONAL CONFERENCE ON MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION (ICMTMA 2015), 2015, : 704 - 707
  • [2] Stability Analysis of Foundation Pit Excavation Based on Finite Difference FLAC3D
    Cheng, Hongmei
    Journal of Railway Engineering Society, 2023, 40 (06) : 32 - 38
  • [3] Numerical analysis on the impact of foundation pit excavation on adjacent metro tunnel
    Junsheng, Chen (jschen@scut.edu.cn), 1600, E-Journal of Geotechnical Engineering (19):
  • [5] Deformation characteristics of excavation of deep foundation pit at a metro station in Lanzhou
    Zhou Y.
    Ye W.-N.
    Gao S.
    2018, Chinese Society of Civil Engineering (40): : 141 - 146
  • [6] Simulation and analysis of deep excavation and loading by using FLAC3D
    Cui, Kai
    Pan, Xue Kai
    Ling, Zhong Cheng
    ADVANCED RESEARCH ON ENGINEERING MATERIALS, ENERGY, MANAGEMENT AND CONTROL, PTS 1 AND 2, 2012, 424-425 : 295 - 298
  • [7] Analysis of deformation characteristics of foundation pit of metro station and adjacent buildings induced by deep excavation in soft soil
    Liu Nian-wu
    Chen Yi-tian
    Gong Xiao-nan
    Yu Ji-tao
    ROCK AND SOIL MECHANICS, 2019, 40 (04) : 1515 - +
  • [8] Influence of foundation pit excavation on adjacent metro tunnels
    Wang Li-feng
    Pang Jin
    Xu Yun-fu
    Yang Kai-fang
    ROCK AND SOIL MECHANICS, 2016, 37 (07) : 2004 - 2010
  • [9] Numerical simulation for tunnel excavation in stratified rock mass by FLAC3D
    Zhu Zi-qiang
    Li Hai-qing
    Liu Qun-yi
    He Xian-qi
    2009 IEEE 10TH INTERNATIONAL CONFERENCE ON COMPUTER-AIDED INDUSTRIAL DESIGN & CONCEPTUAL DESIGN, VOLS 1-3: E-BUSINESS, CREATIVE DESIGN, MANUFACTURING - CAID&CD'2009, 2009, : 2271 - 2274
  • [10] Analysis of Three-Dimensional Effects for Deep Foundation Pit with FLAC3D
    Zhang, Lin
    He, MingXuan
    ADVANCES IN CIVIL ENGINEERING II, PTS 1-4, 2013, 256-259 : 328 - 331