Solution Method of Regulation Boundary for Industrial Park Virtual Power Plant Considering Power Network Constraints

被引:0
|
作者
Liao, Siyang [1 ,2 ]
He, Cong [1 ,2 ]
Li, Lingfang [3 ]
Xu, Jian [1 ,2 ]
Sun, Yuanzhang [1 ,2 ]
Ke, Deping [1 ,2 ]
机构
[1] Hubei Engineering and Technology Research Center for AC, DC Intelligent Distribution Network, Wuhan University, Wuhan,430072, China
[2] School of Electrical Engineering and Automation, Wuhan University, Wuhan,430072, China
[3] Yunnan Grid Research Construction and Planning Center, Yunnan Power Gird Co., Ltd., Kunming,650011, China
关键词
Computational efficiency - Electric power plant loads - Invariance - Photomapping - State space methods;
D O I
10.7500/AEPS20231206002
中图分类号
学科分类号
摘要
To construct a new power system with renewable energy as its primary component, it is urgent to explore the flexible regulation resources on the load side to participate in grid control and regulation. Industrial parks that contain high energy-consuming loads, such as aluminium electrolyzers and mineral heat furnaces, have good potential for control and regulation. However, due to the constraints of the internal power networks of the parks, accurately solving the regulation boundary is faced with the difficulties of high dimensionality of the variables and non-linearity of the constraints, and the existing methods don’t take into account the computational efficiency and accuracy very well. Hence, the above problem is abstracted as the projection of high-dimensional nonlinear state space in the P-Q coupling plane: the projection solution models of the regulation boundary considering the linearized and nonlinear constraints on the safe operation of the industrial park are established, respectively, and a novel high-dimensional state space projection algorithm is adopted to obtain the accurate projection of the regulation boundary of the industrial park virtual power plant through the two-step solution process of vertexsearching-mapping. The results demonstrate that the regulation boundary solved by the proposed method can be fully characterised by a linear inequality set, which is fully compatible with the existing scheduling system. Combined with the comparison with the superimposed flexible resource regulation capability and the traditional sampling method, the feasibility, and high accuracy and solution efficiency of the method are verified. © 2024 Automation of Electric Power Systems Press. All rights reserved.
引用
收藏
页码:66 / 75
相关论文
共 50 条
  • [1] A Method for Solving the Control Boundary of Industrial Park Type Virtual Power Plants Considering Power Network Constraints
    Wang, Yan
    Han, Fang
    Teng, Yuzhe
    Xiao, Ya
    Fan, Xinxue
    2024 9TH INTERNATIONAL CONFERENCE ON ELECTRONIC TECHNOLOGY AND INFORMATION SCIENCE, ICETIS 2024, 2024, : 328 - 331
  • [2] Preventative Control Method for Virtual Power Plant Considering Transient Frequency Regulation Capability
    Xu Q.
    Cao Y.
    Zhang H.
    Wu Q.
    Li C.
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2022, 46 (18): : 83 - 89
  • [3] Optimal Operation Method of Virtual Power Plant Considering Power Deviation Rate
    Chen Kailing
    Gu Wen
    Wang Haiqun
    2021 IEEE IAS INDUSTRIAL AND COMMERCIAL POWER SYSTEM ASIA (IEEE I&CPS ASIA 2021), 2021, : 1381 - 1386
  • [4] Solution Method of Virtual Power Plant Dynamic Feasible Region Based on Decoupling of Coupling Constraints
    Xu Z.
    He J.
    Liu Z.
    Chen W.
    Wang X.
    Zhang P.
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2024, 44 (09): : 3440 - 3451
  • [5] Optimal Aggregation Approach for Virtual Power Plant Considering Network Reconfiguration
    Long Wang
    Wenchuan Wu
    Qiuyu Lu
    Yinguo Yang
    JournalofModernPowerSystemsandCleanEnergy, 2021, 9 (03) : 495 - 501
  • [6] Optimal Aggregation Approach for Virtual Power Plant Considering Network Reconfiguration
    Wang, Long
    Wu, Wenchuan
    Lu, Qiuyu
    Yang, Yinguo
    JOURNAL OF MODERN POWER SYSTEMS AND CLEAN ENERGY, 2021, 9 (03) : 495 - 501
  • [7] Optimal configuration method of electric heating in a virtual power plant with peak load regulation considering a wind power delivery protocol
    Wang H.
    Wei X.
    Li B.
    1600, Power System Protection and Control Press (49): : 135 - 144
  • [8] A comprehensive decision method for orderly power utilization considering network constraints
    Peng, Bo
    Qiu, Yiwei
    Chen, Junquan
    Wu, Hao
    Song, Yonghua
    Dianwang Jishu/Power System Technology, 2015, 39 (03): : 797 - 803
  • [9] Distributed Frequency Regulation Method for Power Grids Considering the Delayed Response of Virtual Power Plants
    Qi, Jun
    Ying, Anning
    Zhang, Bohang
    Zhou, Dan
    Weng, Guoqing
    ENERGIES, 2025, 18 (06)
  • [10] Operation mode of virtual power plant considering peak regulation auxiliary service
    Li J.
    Ai Q.
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2021, 41 (06): : 1 - 7