共 50 条
- [1] Stability analysis of Zhoushan subsea tunnel with drill-and-blast construction method Yantu Lixue/Rock and Soil Mechanics, 2009, 30 (11): : 3453 - 3459
- [3] Study on Vibration Displacement of Ground Building Caused by Construction of Shallowly Bored Tunnel with Drill and Blast Method CIVIL, STRUCTURAL AND ENVIRONMENTAL ENGINEERING, PTS 1-4, 2014, 838-841 : 1359 - 1362
- [4] Research Status and Development Trends in Intelligent Construction of Drill-and-blast Tunnels Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2024, 37 (07): : 1 - 21
- [5] Spice: Is a capability maturity model applicable in the construction industry? DURABILITY OF BUILDING MATERIALS AND COMPONENTS 8, VOLS 1-4, PROCEEDINGS, 1999, : 2836 - 2843
- [6] Capability Maturity Model Integrated for Ship Design and Construction ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: INNOVATIVE AND KNOWLEDGE-BASED PRODUCTION MANAGEMENT IN A GLOBAL-LOCAL WORLD, APMS 2014, PT III, 2014, 440 : 296 - 303
- [7] Research and Application of Capability Maturity Model for Chinese Intelligent Manufacturing 11TH CIRP CONFERENCE ON INDUSTRIAL PRODUCT-SERVICE SYSTEMS, 2019, 83 : 794 - 799
- [9] A Study of the Effects of Geological Conditions on Korean Tunnel Construction Time Using the Updated NTNU Drill and Blast Prediction Model APPLIED SCIENCES-BASEL, 2021, 11 (21):