Capability maturity evaluation model for intelligent tunnel construction by drill and blast method

被引:0
|
作者
Sicheng, Zhao [1 ]
Xiaojun, Li [1 ,3 ]
Bo, Xu [4 ,5 ]
Yi, Rui [1 ,3 ]
Hehua, Zhu [1 ,2 ,3 ]
机构
[1] College of Civil Engineering, Tongji University, Shanghai,200092, China
[2] Key Laboratory of Ceoteehnieal and Underground Engineering of Ministry of Education, Tongji University, Shanghai,200092, China
[3] Engineering Hesearrh Center of Civil Information Technolog, Ministry of Education, Tongji University, Shanghai,200092, China
[4] State Key Laboratory of Kail Transit Engineering Informatization (ESDI), Xi'an,710043, China
[5] China Railway Eirst Survey and Design Institute Croup Co., Ltd., Xi'an,710043, China
关键词
Engineering Village;
D O I
暂无
中图分类号
学科分类号
摘要
Construction technologies - Drill and blast method - Drill and blast method tunnel - Evaluation models - Future trends - Intelligent constructions - Intelligent drilling - Maturity levels - Maturity model - Tunnel construction
引用
收藏
页码:20 / 28
相关论文
共 50 条
  • [1] Stability analysis of Zhoushan subsea tunnel with drill-and-blast construction method
    Yu, Li-Yuan
    Li, Shu-Cai
    Xu, Bang-Shu
    Yantu Lixue/Rock and Soil Mechanics, 2009, 30 (11): : 3453 - 3459
  • [2] Stability analysis of Zhoushan subsea tunnel with drill-and-blast construction method
    Yu Li-yuan
    Li Shu-cai
    Xu Bang-shu
    ROCK AND SOIL MECHANICS, 2009, 30 (11) : 3453 - 3459
  • [3] Study on Vibration Displacement of Ground Building Caused by Construction of Shallowly Bored Tunnel with Drill and Blast Method
    Zhou, Xiaojun
    Sheng, Qi
    Guo, Rui
    CIVIL, STRUCTURAL AND ENVIRONMENTAL ENGINEERING, PTS 1-4, 2014, 838-841 : 1359 - 1362
  • [4] Research Status and Development Trends in Intelligent Construction of Drill-and-blast Tunnels
    Li, Li-Ping
    Zou, Hao
    Liu, Hong-Liang
    Tu, Wen-Feng
    Chen, Yu-Xuc
    Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2024, 37 (07): : 1 - 21
  • [5] Spice: Is a capability maturity model applicable in the construction industry?
    Sarshar, M
    Finnemore, M
    Haigh, R
    Goulding, J
    DURABILITY OF BUILDING MATERIALS AND COMPONENTS 8, VOLS 1-4, PROCEEDINGS, 1999, : 2836 - 2843
  • [6] Capability Maturity Model Integrated for Ship Design and Construction
    Caracchi, Serena
    Sriram, Pavan Kumar
    Semini, Marco
    Strandhagen, Jan Ola
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: INNOVATIVE AND KNOWLEDGE-BASED PRODUCTION MANAGEMENT IN A GLOBAL-LOCAL WORLD, APMS 2014, PT III, 2014, 440 : 296 - 303
  • [7] Research and Application of Capability Maturity Model for Chinese Intelligent Manufacturing
    Hu, Jingyi
    Gao, Sini
    11TH CIRP CONFERENCE ON INDUSTRIAL PRODUCT-SERVICE SYSTEMS, 2019, 83 : 794 - 799
  • [8] A Capability Maturity Model for Intelligent Manufacturing in Chair Industry Enterprises
    Wang, Wanqiang
    Wang, Jiadong
    Chen, Chang
    Su, Shaohui
    Chu, Changyong
    Chen, Guojin
    PROCESSES, 2022, 10 (06)
  • [9] A Study of the Effects of Geological Conditions on Korean Tunnel Construction Time Using the Updated NTNU Drill and Blast Prediction Model
    Kim, Yangkyun
    Lee, Sean Seungwon
    APPLIED SCIENCES-BASEL, 2021, 11 (21):
  • [10] A conceptual model for measuring the maturity of an Intelligent Construction Environment
    Fernandes, Luara Lopes de Araujo
    Costa, Dayana Bastos
    ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2024, 20 (06) : 1403 - 1426