Mechanical model of water head height of non-cemented backfill in sublevel stoping with cemented filling

被引:2
|
作者
Zhang A.-Q. [1 ,2 ]
Wu A.-X. [2 ]
Wang Y.-M. [2 ]
Wang H.-J. [2 ]
Yin S.-H. [2 ]
Wang Z.-Y. [3 ]
机构
[1] College of Architectural Engineering, North China Institute of Aerospace Engineering, Langfang
[2] Research Center of Paste Backfill and Mining, University of Science and Technology Beijing, Beijing
[3] Huibaoling Iron Mine, Linyi, Shandong Energy Mining Croup Co., Ltd., Linyi
基金
中国国家自然科学基金;
关键词
Filling blocking wall; Mechanical model; Non cemented filling; Water head height;
D O I
10.11817/j.ysxb.1004.0609.2021-35996
中图分类号
学科分类号
摘要
To prevent the height of non-cemented filling top water in sublevel stoping with cemented filling being too large to cause slurry overflowing and damage the filling blocking wall, the paper established a mechanical model of non-cemented filling top water height in sublevel stoping with cemented filling and solves it by using theory based on the assumption of elasticity. Taking iron ore for project, the paper applies CVM to study the variation of filling blocking wall carrying load under the conditions of different filling settlement ratio and top water height in whole tailings non cemented filling. The results show that under the premise of certain filling blocking wall height, filling slurry density and top water height, the bearing load of filling blocking wall increases with increase of the filling settlement ratio which is expressed by a quadratic polynomial equation. And under the premise of certain filling settlement ratio, the bearing load increases with the increasing of top water height which is expressed by a linear relationship. The terminal safety top water height of whole tailings non-cemented filling is 2 m in iron ore, which is the same with the result of engineering detection, and the research has some engineering practical significance. © 2021, Science Press. All right reserved.
引用
收藏
页码:1686 / 1693
页数:7
相关论文
共 18 条
  • [1] DU Cheng-wei, HOU Hua-shan, Research on the application of the method of the sub cemented filling method in Huibaoling iron, Shandong Coal Technology, 1, pp. 28-29, (2016)
  • [2] LI Bao-jian, ZHOU Yong, LIU Yun-qiu, Et al., New technology of full tailings non-cemented backfilling in Huibaoling Iron Mine, Metal Mine, 11, S1, pp. 33-35, (2015)
  • [3] WANG Xiao-ning, CAI Si-jing, QIN Xing-lang, Optimization on the stope structure parameter for sublevel filling method in a gold mine of Xinjiang, Mining Research and Development, 38, 3, pp. 1-5, (2018)
  • [4] CHENG Hai-yong, WU Ai-xiang, ZHOU Sheng-ping, Et al., Experiment and numerical simulation of forced air dewatering in non cemented filling stope, The Chinese Journal of Nonferrous Metals, 27, 4, pp. 811-817, (2017)
  • [5] ZHANG Ai-qing, WANG Yi-ming, SUN Hui-xi, Et al., Research on strengthening of dehydration test and law for non-cemented hackfill, Industrial Minerals & Processing, 10, pp. 50-54, (2018)
  • [6] ZHANG Ai-qing, WU Ai-xiang, WANG Yi-ming, Et al., Design of a new dehydration tube based on bionics and its dehydration law, Journal of Chongqing University
  • [7] JIANG Li-chun, SU Yong, Theoretical model and application of critical blasting vibration velocity for instability of cemented backfill pillar, The Chinese Journal of Nonferrous Metals, 29, 11, pp. 2663-2670, (2019)
  • [8] CAO Shuai, DU Cui-feng, TAN Yu-ye, Et al., Mechanical model analysis of consolidated filling pillar using stage-delayed backfill in metal mines, Rock and Soil Mechanics, 36, 8, pp. 2370-2376, (2015)
  • [9] ZHANG Ai-qing, Mechanical property of interbeded filling body and its effect on stability of the retaining wall, (2019)
  • [10] CHANG Ju-cai, CHEN Gui, XU Wen-song, Safety mining analysis of water proof coal pillars by fully mechanized top-coal caving method in the thick coal seam under thin bedrock overlain by thick alluvium, Hydrogeology Engineering Geology, 41, 2, pp. 134-137, (2014)