Review Strategy of Application for Extension of Validity Period of Operation License for Research Reactor

被引:0
|
作者
Yang Z. [1 ]
机构
[1] Department of Nuclear Power Safety Supervision, Ministry of Ecological Environment, Beijing
来源
Hedongli Gongcheng/Nuclear Power Engineering | 2022年 / 43卷 / 06期
关键词
Extension of validity period; Operation license; Research reactor; Review strategy of application;
D O I
10.13832/j.jnpe.2022.06.0151
中图分类号
学科分类号
摘要
The Ministry of Ecology and Environment Order No. 8 "Regulations on Safety Permit Procedures for Nuclear Power Plants, Research Reactors and Nuclear Fuel Cycle Facilities" (hereinafter referred to as the "Regulations") has made new clear provisions on the extension of operation licenses for nuclear power plants, research reactors and nuclear fuel cycle facilities. In order to promote the establishment of the aging management standard system of research reactors in China, the development history of life extension review strategy of research reactors in China is analyzed in this paper. Combined with several key issues in the review of the application for extension of the validity period of the operation license of research reactors such as high-flux engineering test reactor, the review strategy is proposed, which gives priority to periodic safety review, focuses on aging management and takes into account the review of technical specifications and differences. The research results provide practical experience and theoretical guidance for the establishment of regulations and standards for research reactor aging management in China. © 2022 Yuan Zi Neng Chuban She. All rights reserved.
引用
收藏
页码:151 / 154
页数:3
相关论文
共 8 条
  • [1] 14, 1, pp. 1-11, (2015)
  • [2] 12, pp. 134-137, (2013)
  • [3] 4, pp. 1-8, (2006)
  • [4] Ageing Management for Research Reactors: Specific Safety Guide: SSG-10, (2010)
  • [5] SANWARWALLA M H., Time limited aging analyses requirements for license renewal for U.S. nuclear power plants, JSME 2004 Pressure Vessels and Piping Conference, (2004)
  • [6] Industry guideline for implementing the requirements of CFR part 54-the license renewal rule: NEI95-10, (2005)
  • [7] Standard review plan for review of license renewal applications for nuclear power plants: NUREG-1800, (2010)
  • [8] Generic aging lessons learned (GALL) report: NUREG-1801, (2001)