共 26 条
- [1] Analysis of stability of shallow-buried tunnel built by pipe-roof pre-construction method Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2012, 43 (09): : 3646 - 3651
- [5] Influence of construction sequence of pipe jacking by pipe-roof pre-construction method on ground surface settlement Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2020, 54 (09): : 1706 - 1714
- [7] Ground Surface Settlement Induced by Large Diameter Jacking-pipe Construction in Pipe-roof Pre-construction Method Gongcheng Kexue Yu Jishu/Advanced Engineering Sciences, 2020, 52 (04): : 141 - 148
- [10] Surface subsidence caused by construction of large diameter curved jacking-pipes in pipe-roof pre-construction method Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2013, 44 (11): : 4687 - 4693