Study and Application of the Key Technology of Tunnel Construction Under Ultra-Shallow Burial Condition by Pipe-Roof Pre-Construction Method

被引:0
|
作者
Wang, Qingbiao [1 ]
Hu, Zhongjing [2 ]
Ma, Yiming [1 ]
Lv, Hao [2 ]
Zhang, Cong [1 ]
Wang, Keyong [1 ]
Sun, Yong [1 ]
机构
[1] College of Resources, Shandong University of Science and Technology, Shandong, Taian,271019, China
[2] College of Safety and Environmental Engineering, College of Safety and Emergency Management, Shandong University of Science and Technology, Qingdao,266590, China
来源
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
Roofs
引用
收藏
相关论文
共 26 条
  • [1] Analysis of stability of shallow-buried tunnel built by pipe-roof pre-construction method
    Li, Yong-Suo
    Zhang, Ke-Neng
    Huang, Chang-Bo
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2012, 43 (09): : 3646 - 3651
  • [2] Analysis of surface subsidence of tunnel built by pipe-roof pre-construction method
    Li Yong-suo
    Zhang Ke-neng
    Huang Chang-bo
    Li Zhong
    Deng Mei-long
    ROCK AND SOIL MECHANICS, 2011, 32 (12) : 3701 - 3707
  • [3] Research of Pipe Cutting and Support in the Pipe-Roof Pre-Construction Method
    Yang, Xian
    Liu, Yang
    Li, Yongsuo
    Yang, Zeyu
    FRONTIERS IN EARTH SCIENCE, 2022, 10
  • [4] Ground and tunnel deformation induced by excavation in pipe-roof pre-construction tunnel: A case study
    Yang, Songsong
    Zhang, Dingwen
    Wang, Mei
    Li, Jiyang
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2023, 131
  • [5] Influence of construction sequence of pipe jacking by pipe-roof pre-construction method on ground surface settlement
    Yang S.-S.
    Wang M.
    Du J.-A.
    Guo Y.
    Gen Y.
    Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2020, 54 (09): : 1706 - 1714
  • [6] Research on flexural performance of new pipe-roof pre-construction structures
    Shi, Han
    Ji, Weiwei
    Zhang, Yanqing
    Lv, Yvxuan
    Yong, Liu
    You, Longfei
    STRUCTURES, 2023, 57
  • [7] Ground Surface Settlement Induced by Large Diameter Jacking-pipe Construction in Pipe-roof Pre-construction Method
    Wang M.
    Yang S.
    Du J.
    Guo Y.
    Gongcheng Kexue Yu Jishu/Advanced Engineering Sciences, 2020, 52 (04): : 141 - 148
  • [8] Ground settlement caused by pipe-roof pre-construction method: Effect of the sequence of jacking pipe groups
    Yang, Song-song
    Zhang, Ding-wen
    Wang, Miao
    Xu, Jing-min
    Shen, Chen
    Zhang, Chao-zhe
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2024, 31 (02) : 576 - 588
  • [9] Research of jacking force of densely arranged pipe jacks process in pipe-roof pre-construction method
    Yang, Songsong
    Wang, Mei
    Du, Jianan
    Guo, Yong
    Geng, Yan
    Li, Teng
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2020, 97
  • [10] Surface subsidence caused by construction of large diameter curved jacking-pipes in pipe-roof pre-construction method
    Li, Yongsuo
    Yang, Junsheng
    Zhang, Keneng
    Huang, Changbo
    Ma, Yanna
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2013, 44 (11): : 4687 - 4693