Forecasting Technique Bridges Gap between Material Balance and Reservoir Simulation

被引:0
|
作者
Carpenter, Chris
机构
来源
JPT, Journal of Petroleum Technology | 2022年 / 74卷 / 07期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:49 / 51
相关论文
共 50 条
  • [1] TECHNIQUE FOR IMPROVING MATERIAL BALANCE ACCURACY IN RESERVOIR SIMULATION
    MERCHANT, AR
    ARNOLD, MD
    HARVEY, AH
    JOURNAL OF PETROLEUM TECHNOLOGY, 1974, 26 (MAR): : 303 - 303
  • [2] MATERIAL BALANCE APPROACH VS RESERVOIR SIMULATION AS AN AID TO UNDERSTANDING RESERVOIR MECHANICS
    ALI, SMF
    NIELSEN, RF
    JOURNAL OF PETROLEUM TECHNOLOGY, 1970, 22 (SEP): : 1057 - &
  • [3] Virtual reality simulation bridges the gap between manufacturing and design
    Bennett, G.R.
    Mechanical incorporated engineer, 1995, 7 (02): : 43 - 46
  • [4] Plasmonic material bridges photonics, electronics gap
    Paddock, Ashley N.
    PHOTONICS SPECTRA, 2012, 46 (06) : 18 - 19
  • [5] A Material Balance Equation for a Sour Gas Reservoir
    Hu, J. -H.
    He, S. -L.
    Zhao, J. -Z.
    Li, Y. -M.
    Zhao, Z. -Z.
    PETROLEUM SCIENCE AND TECHNOLOGY, 2014, 32 (06) : 712 - 719
  • [6] Improvements to reservoir material-balance methods
    Pletcher, JL
    SPE RESERVOIR EVALUATION & ENGINEERING, 2002, 5 (01) : 49 - 59
  • [7] Optimizing and accelerating history matching progress of numerical reservoir simulation by using material balance analysis
    Yang, Yaozhong
    Yu, Jinbiao
    Wang, Yong
    Ma, Chengjie
    2020 2ND INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE COMMUNICATION AND NETWORK SECURITY (CSCNS2020), 2021, 336
  • [8] 4D seismic with reservoir simulation improves reservoir forecasting
    Ketineni, Sarath Pavan
    Kalla, Subhash
    Oppert, Shauna
    Billiter, Travis
    JPT, Journal of Petroleum Technology, 2019, 71 (03): : 90 - 91
  • [9] Adjustment of a reservoir model by the material balance method in the MBAL program. Setting up the integrated model in GAP
    Korotkov, R. N.
    Ovcharenko, D. M.
    Erofeev, V. I.
    BULLETIN OF THE TOMSK POLYTECHNIC UNIVERSITY-GEO ASSETS ENGINEERING, 2024, 335 (02): : 133 - 140
  • [10] Novel reservoir system simulation procedure for gap minimization between water supply and demand
    Allawi, Mohammed Falah
    Jaafar, Othman
    Hamzah, Firdaus Mohamad
    El-Shafie, Ahmed
    JOURNAL OF CLEANER PRODUCTION, 2019, 206 : 928 - 943