Collaborative Optimization of Rail Mounted Gantry Crane and Container Truck Based on Actual Transportation Capacity in Railway Container Terminals

被引:0
|
作者
Chang Y. [1 ]
Wang Y. [1 ]
Zhu X. [2 ]
机构
[1] Logistics School, Beijing Wuzi University, Beijing
[2] School of Traffic and Transportation, Beijing Jiaotong University, Beijing
基金
中国国家自然科学基金;
关键词
equipment collaborative optimization; genetic simulated annealing algorithm; one truck with two containers; railway container terminal; railway transportation; transportation capacity;
D O I
10.16097/j.cnki.1009-6744.2024.01.019
中图分类号
学科分类号
摘要
To address the problem posed by limited equipment resources in railway container terminals, this study focuses on the collaborative optimization problem of rail mounted gantry crane and container truck based on the actual transportation capacity of container trucks within the mode of one-truck-two-containers. An integer programming model is formulated with the objective of minimizing truck completion times of the trucks. The model considers task allocations of containers within the one-truck-two-containers mode and incorporates safety constraints relevant to rail mounted gantry cranes. To solve the model, a genetic simulated annealing algorithm considering the distribution strategy of the rail crane is designed. Three sets of experiments with different scales are conducted to verify the feasibility and effectiveness of the proposed model and algorithm. The experimental results show that the one-truck-two-containers mode results in an average completion time reduction of 13.3% compared with the traditional collaborative operation under the one-truck-one-container mode. As the scale of examples increases, the time reduction become more significant. Furthermore, the one-truck-two-containers mode exhibits enhanced flexibility in rail mounted gantry crane operations, ensuring a more balanced workload distribution. Importantly, when the resources of container truck are limited, the one-truck-two-containers also improves the utilization rate of equipment. © 2024 Science Press. All rights reserved.
引用
收藏
页码:188 / 198
页数:10
相关论文
共 14 条
  • [1] ZHOU Y, ZHANG J, ZHONG L C, Et al., Flexible cooperative scheduling optimization of multi-track cranes in railway container central station, Journal Transportation Systems Engineering and Information Technology, 22, 1, pp. 133-141, (2022)
  • [2] WANG X L, JIA Y L, CAI J X, Et al., Joint optimization of resource allocation and job scheduling in railway container central station, Control and Decision, 36, 12, pp. 3063-3073, (2021)
  • [3] ZHAO R N., Optimization of loading and unloading equipment scheduling in railway container central station considering synchronous transfer operation, (2021)
  • [4] LIANG C J, YAN Y P, LI L J., Research of vehicle scheduling for dual 40' quay crane, Journal of Railway Science and Engineering, 15, 2, pp. 522-529, (2018)
  • [5] HOP D C, HOP N V, ANH T T M., Adaptive particle swarm optimization for integrated quay crane and yard truck scheduling problem, Computers & Industrial Engineering, 153, (2021)
  • [6] SKAF A, LAMROUS S, HAMMOUDAN Z, Et al., Integrated quay crane and yard truck scheduling problem at port of tripoli-lebanon, Computers & Industrial Engineering, 159, (2021)
  • [7] OLADUGBAL A O, GHEITH M, ELTAWIL A., A new solution approach for the twin yard crane scheduling problem in automated container terminals, Advanced Engineering Informatics, 57, (2023)
  • [8] LIU W Q, ZHU X N, WANG L, Et al., Collaborative scheduling method of port equipment for hot metal combined transport based on disjunction graph, Journal of Railway Science, 44, 8, pp. 14-24, (2022)
  • [9] YUE L J, FAN H M, FAN H., Blocks allocation and handling equipment scheduling in automatic container terminals, Transportation Research Part C: Emerging Technologies, 153, (2023)
  • [10] RUF M, CORDEAU J F, FREJINGER E., The load planning and sequencing problem for double-stack trains, Journal of Rail Transport Planning & Management, 23, (2022)