Engineering Analysis and Research on Fit-up for Field Automatic Welding of Primary Piping in Nuclear Power Plants

被引:0
|
作者
Dong A. [1 ]
Wang H. [1 ]
Guo L. [1 ]
机构
[1] China Nuclear Power Engineering Co. Ltd., Beijing
来源
关键词
Dimension chain; Fit-up; Primary piping; Welding;
D O I
10.13832/j.jnpe.2019.02.0117
中图分类号
O57 [原子核物理学、高能物理学];
学科分类号
070202 ;
摘要
The importance of the fit-up of reactor coolant pipe and its risk were analyzed. Focused on the fit-up situation of the primary piping, this paper proposes an algorithm for the close fit-up dimension chain, and the initial value, constraint value and optimization value were set according to actual engineering. The predicting of the fit-up situation was realized. Meanwhile, this algorithm was tested and verified by theory and engineering. The result is consistent with the actual value. © 2019, Editorial Board of Journal of Nuclear Power Engineering. All right reserved.