共 15 条
- [1] Abdrabbo F, Gaaver K., Challenges and uncertainties relating to open caissons, DFI Journal-the Journal of the Deep Foundations Institute, 6, 1, pp. 21-32, (2012)
- [2] Liu M Y, Chen K, Jing W., Principal component analysis method of construction risk of open caisson foundation in a bridge, Journal of Wuhan University of Technology(Transportation Science & Engineering), 39, 1, pp. 1-4, (2015)
- [3] Deng Y S, Xiong H, Liu R, Et al., Research on construction displacement of north anchorage caisson of parrot cay Yangtze River bridges in Wuhan, Rock and Soil Mechanics, 34, S1, pp. 241-246, (2013)
- [4] Peng Y P, Tu M, Cheng Y., The numerical simulation of position implantation and construction process of super large caisson, Journal of Railway Science and Engineering, 12, 5, pp. 1179-1184, (2015)
- [5] Cao R J., Dynamic simulation and safety performance evaluation of the construction process of the anchorage caisson foundation, (2017)
- [6] Rafiq M I, Chryssanthopoulos M K, Sathananthan S., Bridge condition modelling and prediction using dynamic Bayesian belief networks, Structure and Infrastructure Engineering, 11, 1, pp. 38-50, (2015)
- [7] Mortazavi S, Kheyroddin A, Naderpour H., Risk evaluation and prioritization in bridge construction projects using system dynamics approach, Practice Periodical on Structural Design and Construction, 25, 3, (2020)
- [8] Abdollahzadeh G, Rastgoo S., Risk assessment in bridge construction projects using fault tree and event tree analysis methods based on fuzzy logic, ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B: Mechanical Engineering, 1, 3, (2015)
- [9] Salim W S W, Liew M S, Shafie A., Qualitative fault tree and event tree model of bridge defect for reinforced concrete highway bridge, 2014 InCIEC, pp. 639-650, (2014)
- [10] Chen T T, Wang C H., Fall risk assessment of bridge construction using Bayesian network transferring from fault tree analysis, Journal of Civil Engineering and Management, 23, 2, pp. 273-282, (2017)