Investigating Branched Cut-off Wall Effect on Seepage Using Numerical Modelling

被引:0
|
作者
Thomas, Alex J. [1 ]
Asr, Alireza Ahangar [1 ]
机构
[1] Univ Salford, Sch Sci Engn & Environm, Manchester, England
来源
关键词
Seepage; cut-off wall; numerical analysis; uplift;
D O I
10.13052/ejcm2642-2085.3334
中图分类号
O3 [力学];
学科分类号
08 ; 0801 ;
摘要
In this research, numerical modelling has been conducted to expand on existing research on cut-off walls mainly done by, [2] and [8]. This study is aimed at examining a unique geometric alignment that accommodates 'branches' on either side of a vertical 12-metre-deep cut-off wall and investigates the subsequent effect on seepage (discharge) and uplift force within the foundation of the dam. From the study conducted it had been observed that seepage was reduced with the inclusion of these branches whilst the cut-off wall was located at the centre base of a concrete dam. Subsequent testing of altering the branches' angle presented a further reduction in seepage through the soil strata, with the optimum angle being around the range of 60-70 degrees. Further experimentation had shown that altering the position at two other distinct locations (dam's heel and toe) has had a significant reduction in seepage with the heel being the most effective at reducing it. Uplift pressure has been evaluated to show that the best position for minimal uplift force is at the heel of the dam.
引用
收藏
页码:295 / 328
页数:34
相关论文
共 50 条
  • [1] Characteristics of groundwater seepage with cut-off wall in gravel aquifer. II: Numerical analysis
    Wu, Yong-Xia
    Shen, Shui-Long
    Yin, Zhen-Yu
    Xu, Ye-Shuang
    CANADIAN GEOTECHNICAL JOURNAL, 2015, 52 (10) : 1539 - 1549
  • [2] Cut-off wall construction
    International Division, Bauer Spezialtiefbau GmbH
    Int. Water Power Dam Constr., 2007, 2 (42-44): : 42 - 44
  • [3] Migration of organic contaminants in composite geomembrane cut-off wall considering groundwater seepage
    Peng C.-H.
    Feng S.-J.
    Chen H.-X.
    Luo C.-Y.
    Liang A.-M.
    Ding X.-H.
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2021, 43 (11): : 2055 - 2063
  • [4] Completing cut-off wall construction
    Spezialtiefbau, Bauer
    International Water Power and Dam Construction, 2015, 67 (10): : 22 - 24
  • [5] Cut-off Wall Technologies in Mining
    Schwank, Stefan
    MINING MEETS WATER - CONFLICTS AND SOLUTIONS, 2016, : 468 - 477
  • [6] Research on effect of suspended cut-off wall with simulation test
    Wang, Baotian
    Chen, Xi'an
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2008, 27 (SUPPL.): : 2766 - 2771
  • [7] Seepage Through a Homogeneous Earth-Fill Dam with a Cut-Off Wall on a Permeable Foundation
    Bestuzheva A.S.
    Anakhaev K.K.
    Power Technology and Engineering, 2020, 54 (02): : 147 - 153
  • [8] Seepage Cut-off Wall Detection of Reservoir Based on Groundvue Series of Ground Penetrating Radar
    Yuan Baoyuan
    Li Yongjun
    Bai Yun
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ARCHITECTURAL, CIVIL AND HYDRAULICS ENGINEERING (ICACHE 2015), 2016, 44 : 54 - 57
  • [9] Characteristics of groundwater seepage with cut-off wall in gravel aquifer. I: Field observations
    Wu, Yong-Xia
    Shen, Shui-Long
    Xu, Ye-Shuang
    Yin, Zhen-Yu
    CANADIAN GEOTECHNICAL JOURNAL, 2015, 52 (10) : 1526 - 1538
  • [10] Study on Anti-seepage Effect of Xiongjiagang Earth-Rock Dam Based on Cut-off Wall Schemes
    Han Yong
    Ke Chuanfang
    2010 INTERNATIONAL SYMPOSIUM ON MULTI-FIELD COUPLING THEORY OF ROCK AND SOIL MEDIA AND ITS APPLICATIONS, 2010, : 548 - 552