An Enhanced Horned Lizard Optimization Algorithm for Flood Control Operation of Cascade Reservoirs

被引:0
|
作者
Liu, Chenye [1 ]
Xie, Yangyang [1 ,2 ]
Liu, Saiyan [1 ]
Qin, Jiyao [3 ]
Wei, Jianfeng [4 ]
Fang, Hongyuan [1 ]
Du, Huihua [5 ]
机构
[1] Yangzhou Univ, Coll Hydraul Sci & Engn, Yangzhou 225008, Peoples R China
[2] Yangzhou Univ, Modern Rural Water Resources Res Inst, Yangzhou 225008, Peoples R China
[3] Chongqing Western Water Resources Dev Co Ltd, Chongqing 401329, Peoples R China
[4] Chongqing Yufa Hydraul Res Inst Co Ltd, Chongqing 400020, Peoples R China
[5] Nanjing Hydraul Res Inst, Nanjing 210029, Peoples R China
基金
中国国家自然科学基金;
关键词
Horned Lizard Optimization Algorithm; flood control operation; cascade reservoirs; high-dimensional problem;
D O I
10.3390/w16172458
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The multi-reservoir flood control operation (MRFCO) problem is characterized by high dimensions and multiple constraints. These features pose significant challenges to algorithms aiming to solve the MRFCO problem, requiring them not only to handle high-dimensional variables effectively but also to manage constraints efficiently. The Horned Lizard Optimization Algorithm (HLOA) performs excellently in handling high-dimensional problems and effectively integrates with penalty functions to manage constraints. However, it still exhibits poor convergence when dealing with certain benchmark functions. Therefore, this paper proposes the Enhanced Horned Lizard Optimization Algorithm (EHLOA), which incorporates Circle initialization and two strategies for avoiding local optima, thereby enhancing HLOA's convergence performance. Firstly, EHLOA was tested on benchmark functions, where it demonstrated strong robustness and scalability. Then, EHLOA was applied to the MRFCO problem at the upper section of Lanzhou of the Yellow River in China, showing excellent convergence capabilities and the ability to escape local optima. The reduction rates of flood peaks achieved by EHLOA for the two millennial floods and two decamillennial floods were 55.6%, 52.8%, 58.1%, and 56.4%, respectively. Additionally, the generated operation schemes showed that the reservoir volumes changes were reasonable, and the discharge processes were stable under EHLOA's operation. Overall, EHLOA can be considered a reliable algorithm for addressing the MRFCO problem.
引用
收藏
页数:25
相关论文
共 50 条
  • [1] Optimal Flood-Control Operation of Cascade Reservoirs Using an Improved Particle Swarm Optimization Algorithm
    Diao, Yanfang
    Ma, Haoran
    Wang, Hao
    Wang, Junnuo
    Li, Shuxian
    Li, Xinyu
    Pan, Jieyu
    Qiu, Qingtai
    WATER, 2022, 14 (08)
  • [2] Flood control operation coupled with risk assessment for cascade reservoirs
    Meng, Xuejiao
    Chang, Jianxia
    Wang, Xuebin
    Wang, Yimin
    Wang, Zongzhi
    JOURNAL OF HYDROLOGY, 2019, 572 : 543 - 555
  • [3] Optimal flood control operation for the Three Gorges and Qingjiang cascade reservoirs
    Guo, Shenglian
    Li, Yu
    Chen, Jionghong
    HYDROLOGICAL CYCLE AND WATER RESOURCES SUSTAINABILITY IN CHANGING ENVIRONMENTS, 2011, 350 : 743 - 748
  • [4] Joint Operation and Dynamic Control of Flood Limiting Water Levels for Cascade Reservoirs
    Chen, Jionghong
    Guo, Shenglian
    Li, Yu
    Liu, Pan
    Zhou, Yanlai
    WATER RESOURCES MANAGEMENT, 2013, 27 (03) : 749 - 763
  • [5] Joint Operation and Dynamic Control of Flood Limiting Water Levels for Cascade Reservoirs
    Jionghong Chen
    Shenglian Guo
    Yu Li
    Pan Liu
    Yanlai Zhou
    Water Resources Management, 2013, 27 : 749 - 763
  • [7] An improved particle swarm optimization algorithm for optimal operation of cascade reservoirs
    Peng Yong
    INFORMATION-AN INTERNATIONAL INTERDISCIPLINARY JOURNAL, 2012, 15 (01): : 33 - 40
  • [8] Optimal method to establish joint flood control operation rules with flood forecast information for cascade reservoirs
    Zhang, Gai-Hong
    Wang, Guo-Li
    Zhang, Jing
    Tian, Li
    Dalian Ligong Daxue Xuebao/Journal of Dalian University of Technology, 2010, 50 (01): : 123 - 130
  • [9] An operation model of flood control water levels of cascade reservoirs considering grading flood control objectives and its application
    Zhu D.
    Zhou Y.
    Chen H.
    Guo S.
    Wang J.
    Shuili Xuebao/Journal of Hydraulic Engineering, 2023, 54 (04): : 414 - 425
  • [10] Risk Analysis Method for Flood Control Operation of Cascade Reservoirs Considering Prediction Error
    Zhang, Yan-Ke
    You, Jin-Jun
    Ji, Chang-Ming
    Zhao, Ya-Wei
    PROCEEDINGS OF THE 3RD 2017 INTERNATIONAL CONFERENCE ON SUSTAINABLE DEVELOPMENT (ICSD 2017), 2017, 111 : 30 - 37