Implementation and management of a circular public procurement contract for furniture

被引:3
|
作者
Lingegard, Sofia [1 ]
von Oelreich, Kristina [2 ,3 ]
机构
[1] KTH Royal Inst Technol, Dept Sustainable Dev Environm Sci & Engn SEED, Stockholm, Sweden
[2] KTH Royal Inst Technol, Sustainabil Off, Stockholm, Sweden
[3] Malardalens Univ, Div Sustainable & Construct, Vasteras, Sweden
来源
关键词
circular economy (CE); furniture; product-service systems (PSS); public procurement; remanufacturing; organizational change; PRODUCT-SERVICE SYSTEMS; SUSTAINABLE PROCUREMENT; PRODUCT/SERVICE-SYSTEMS; INNOVATION; ECONOMY; DESIGN; OPPORTUNITIES; CHALLENGES; BARRIERS;
D O I
10.3389/frsus.2023.1136725
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Circular public procurement (CPP) is one way to increase sustainability and circularity in public spending. As previous research focuses primarily on procurement, more insight is needed on the latter stages CPP. Real-life examples of CPP implementation are also required to promote the concept to practitioners, improve governance, and add depth to the literature. This study, therefore, provides in-depth knowledge of CPP implementation and management by analyzing a case of circular furniture flows and its implications for the procuring organization. The focus on furniture is motivated by the large volumes sent to landfills every year despite its remanufacturing potential, as well as the large environmental impact for production, a potentially long lifetime, and an often-high purchasing price. The results show that strategic decisions to prioritize sustainability are necessary when resource efficiency and cost reductions do not align in a short-term perspective. A more centralized governance structure facilitates decisions on reuse, remanufacturing and disposal in an organization, e.g., coordination of products for remanufacturing, pooling products for reuse, and standardization of design choices. Follow-up and inventory systems are crucial tools for integrating previously installed products with CPP, keeping track of circular flows, and providing feedback to improve subsequent procurements. Crucial elements in the follow-up include adaptation to circularity in the economy system and accounting for the prolonged life and reuse of furniture. The study's results emphasize how an organization's prerequisites play an essential part in the implementation of CPP and that contextual solutions are needed for circular challenges. The study contributes to the fields of policy implementation, CPP, and the use of circular business models in a public context, as well as to the less explored field of procurement in a circular economy context. Suggestions for future research include studies on product categories with other environmental impact profiles, and on waste management regulations that can make or break circular systems.
引用
收藏
页数:16
相关论文
共 50 条
  • [1] The Market's Maturity for Public Procurement of Circular Furniture: A Study from Latvia
    Simanovska, Jana
    Pelsa, Inese
    EUROPEAN INTEGRATION STUDIES, 2021, (15) : 242 - 250
  • [2] Approach of the bidders to public procurement of the academic furniture
    Tkalec, Stjepan
    Pasic, Ines
    16th International Scientific Conference on Furniture and Equipping of Interiors, Proceedings, 2005, : 35 - 45
  • [3] Contract renewal and incentives in public procurement
    Dalen, DM
    Moen, ER
    Riis, C
    INTERNATIONAL JOURNAL OF INDUSTRIAL ORGANIZATION, 2006, 24 (02) : 269 - 285
  • [4] Lobbying and contract delegation in public procurement
    Theilen, Bernd
    B E JOURNAL OF ECONOMIC ANALYSIS & POLICY, 2008, 8 (01):
  • [5] ARBITRATION CLAUSE IN A CONTRACT FOR PUBLIC PROCUREMENT
    Subev, Sabin Ivanov
    21ST INTERNATIONAL CONFERENCE THE KNOWLEDGE-BASED ORGANIZATION, 2015, 21 : 516 - 519
  • [6] Supplier development and public procurement performance: Does contract management difficulty matter?
    Changalima, Ismail Abdi
    Mchopa, Alban Dismas
    Ismail, Ismail Juma
    COGENT BUSINESS & MANAGEMENT, 2022, 9 (01):
  • [7] Review of green and sustainable public procurement: Towards circular public procurement
    Sonnichsen, Sonnich Dahl
    Clement, Jesper
    JOURNAL OF CLEANER PRODUCTION, 2020, 245
  • [8] PROCUREMENT STRATEGY AND CONTRACT MANAGEMENT PHILOSOPHY
    NASH, P
    MCGILL, R
    OCALLAGHAN, J
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 1994, 102 : 76 - 82
  • [9] Contract Management and Accountability in Government Procurement
    Peng, Yanmei
    PROCEEDINGS OF THE 2009 INTERNATIONAL CONFERENCE ON PUBLIC ECONOMICS AND MANAGEMENT ICPEM 2009, VOL 4: ECONOMETRICS, 2009, : 20 - 22
  • [10] TRANSPARENCY AND MONITORING OF PUBLIC PROCUREMENT CONTRACT PERFORMANCE
    Tatrai, Tuende
    Ferk, Petra
    Bianchini, Valentina
    Komsic, Nikola
    TRANSYLVANIAN REVIEW OF ADMINISTRATIVE SCIENCES, 2024, (71E) : 78 - 94