CVaR-based planning of park-level integrated energy system considering extreme scenarios of energy prices

被引:3
|
作者
Lin, Shunfu [1 ]
Zhou, Jiayan [1 ]
Tan, Jin [1 ]
Wu, Qiuwei [2 ]
机构
[1] Shanghai Univ Elect Power, Coll Elect Engn, Shanghai 200090, Peoples R China
[2] Tsinghua Univ, Tsinghua Berkeley Shenzhen Inst, Tsinghua Shenzhen Int Grad Sch, Shenzhen, Peoples R China
关键词
Conditional value at risk; Correlation of uncertainties; Extreme scenario; Park -level integrated energy system; Planning; DEMAND RESPONSE; ELECTRICITY; MODEL;
D O I
10.1016/j.ijepes.2024.110001
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The uncertainty and correlation of energy prices pose challenges to the planning and operation of park-level integrated energy systems. Especially, the extreme scenarios in both electricity and natural gas prices would result in significant economic losses, which have not been fully studied in the planning of park-level integrated energy systems. In this regard, this paper proposes a conditional-value-at-risk-based planning method for the park-level integrated energy system that considers both the extreme scenarios of energy prices and the correlation between the electricity price and natural gas price. First, the Gaussian mixture model is used to model the probability distribution function of the electricity price and natural gas price with high accuracy. Then, the Frank-Copula function is adopted to model the correlation between energy prices in different energy markets. Furthermore, a novel scenario generation method preserving extreme scenarios of energy prices is proposed, where extreme price scenarios are identified in the scenario generation process and subsequently preserved in scenario reduction. Finally, a conditional-value-at-risk-based planning model is proposed to optimize the overall investment and operation costs of the park-level integrated energy system, where the operational risks introduced by renewable generation and energy markets are effectively handled by the conditional value at risk. Case studies demonstrate that compared with the model without the consideration of extreme scenarios of energy prices, the potential risk loss of the proposed model is reduced by 3% in the same generated scenarios. The proposed model is more beneficial in enhancing the system's resilience to the risk.
引用
收藏
页数:11
相关论文
共 50 条
  • [1] A CVaR-based risk assessment method for park-level integrated energy system considering the uncertainties and correlation of energy prices
    Mu, Yunfei
    Wang, Congshan
    Cao, Yan
    Jia, Hongjie
    Zhang, Qingzhu
    Yu, Xiaodan
    Energy, 2022, 247
  • [2] A CVaR-based risk assessment method for park-level integrated energy system considering the uncertainties and correlation of energy prices
    Mu, Yunfei
    Wang, Congshan
    Cao, Yan
    Jia, Hongjie
    Zhang, Qingzhu
    Yu, Xiaodan
    ENERGY, 2022, 247
  • [3] Risk assessment of park-level integrated energy system considering uncertainty and dynamic correlation of energy prices
    Cao, Yan
    Wang, Congshan
    Mu, Yunfei
    Jia, Hongjie
    Yuan, Kai
    Song, Yi
    ENERGY REPORTS, 2021, 7 : 451 - 459
  • [4] Low-carbon planning of park-level integrated energy system considering generalized energy storage
    Zhang X.
    Chen S.
    Wei Z.
    Liang Z.
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2024, 44 (03): : 40 - 48
  • [5] A planning method for park-level integrated energy system based on system integration theory
    Wang, Huiyuan
    Jia, Chaoyu
    Jia, Hongjie
    Mu, Yunfei
    Xu, Xiandong
    Yu, Xiaodan
    APPLIED ENERGY, 2025, 388
  • [6] Energy Coordination Strategy for the Park-Level Integrated Energy System
    Li, Xinyi
    Yang, Xiaohua
    Zhu, Yongqiang
    2024 IEEE 2ND INTERNATIONAL CONFERENCE ON POWER SCIENCE AND TECHNOLOGY, ICPST 2024, 2024, : 1741 - 1745
  • [7] Robust planning and economic analysis of park-level integrated energy system considering photovoltaic/thermal equipment
    Zhang, Chaoyi
    Jiao, Zaibin
    Liu, Junshan
    Ning, Keer
    APPLIED ENERGY, 2023, 348
  • [8] Multi-stage Planning of Park-level Integrated Energy System Considering Construction Time Sequence
    Cao Y.
    Mu Y.
    Jia H.
    Yu X.
    Song Y.
    Wu K.
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2020, 40 (21): : 6815 - 6827
  • [9] CVaR-based economic optimal dispatch of integrated energy system
    Hu H.
    Wang Y.
    Zeng B.
    Zhang J.
    Shi J.
    1600, Electric Power Automation Equipment Press (37): : 209 - 219
  • [10] Capacity planning and optimization of business park-level integrated energy system based on investment constraints
    Wang, Yongli
    Li, Ruiwen
    Dong, Huanran
    Ma, Yuze
    Yang, Jiale
    Zhang, Fuwei
    Zhu, Jinrong
    Li, Shuqing
    ENERGY, 2019, 189