Optimal Preventive Maintenance Policy for Equipment Rented under Free Leasing as a Contributor to Sustainable Development

被引:1
|
作者
Tlili, Lazhar [1 ,2 ]
Chelbi, Anis [3 ,4 ]
Gharyani, Rim [3 ]
Trabelsi, Wajdi [5 ]
机构
[1] Univ Carthage, Natl Sch Adv Sci & Technol Borj Cedria, Borj Cedria 2084, Tunisia
[2] Univ Tunis, Lab LR20ES02 RIFTSI, Lab Rech Robot Intelligente, Fiabil & Traitement Signal & Images, Tunis 1008, Tunisia
[3] Univ Tunis, Ecole Natl Super Ingn Tunis ENSIT, Lab LR20ES02 RIFTSI, Tunis 1008, Tunisia
[4] South Mediterranean Univ, Mediterranean Sch Business, Lac 2, Tunis 1053, Tunisia
[5] ICN Business Sch, Lab Genie Informat Prod & Maintenance LGIPM, F-57073 Metz, France
关键词
closed-loop supply chains; circular business models; leasing; imperfect preventive maintenance; virtual age; Artificial Bee Colony algorithm; LEASED EQUIPMENT; FAILURE-RATE; OPTIMIZATION; STRATEGIES; ALGORITHM;
D O I
10.3390/su16093860
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Leasing has proven to be a business model that is perfectly suited to the circular economy. It significantly contributes to sustainable development by enabling the reuse of machinery and equipment after each lease period and by including preventive maintenance and overhauls within and between lease terms. This helps to extend the life cycle of equipment, promote value recovery, and reduce waste. This paper examines an imperfect preventive maintenance (PM) strategy applied to equipment rented under the terms of "free leasing". In free leasing, the lessor makes the equipment available to the customer for a specified period of time without charging rent. In return, the customer is required to purchase the equipment's consumables exclusively from the lessor. The lessor is also responsible for the maintenance of the equipment at the customer's premises. The greater the quantity of consumables used by the customer, the more the equipment will deteriorate. Consequently, the lessor must be able to determine the most effective approach to preventive maintenance, ensuring that it aligns with the customer's planned usage rate while maximizing profit. This work proposes a PM strategy to be adopted by the lessor during the free lease period. This strategy involves the performance of imperfect PM actions just before the start of the lease period and then periodically. Different packages of preventive actions can be applied each time, with each package having a different cost depending on the level of effectiveness in terms of rejuvenating the equipment. Minimal repairs are performed in the event of equipment failure. The decision variables are the PM period to be adopted and the maintenance efficiency level to be chosen for each preventive intervention. The objective is to determine, for a given customer with an estimated consumption rate profile of consumables, the optimal values of these decision variables so that the lessor maximizes their profit. A mathematical model is developed to express the lessor's average profit over each lease period. A solution procedure is developed for small instances of the problem, and an Artificial Bee Colony algorithm is implemented for larger instances. A numerical example and a sensitivity analysis are presented.
引用
收藏
页数:24
相关论文
共 50 条
  • [1] Optimal periodic preventive maintenance policy for leased equipment
    Pongpech, J.
    Murthy, D. N. P.
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2006, 91 (07) : 772 - 777
  • [2] Optimal hybrid imperfect preventive maintenance policy for leased equipment
    Ben Mabrouk, A.
    Chelbi, A.
    Radhoui, M.
    IFAC PAPERSONLINE, 2017, 50 (01): : 13698 - 13703
  • [3] Optimal "Sporadic" and Systematic Preventive Maintenance Policy for Leased Equipment under Various Operating Conditions
    Schutz, Jeremie
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: INNOVATIVE AND KNOWLEDGE-BASED PRODUCTION MANAGEMENT IN A GLOBAL-LOCAL WORLD, PT 1, 2014, 438 : 451 - 458
  • [4] Optimal preventive maintenance policies for equipment under condition monitoring
    Yao, Yun-Zhi
    Meng, Chen
    Wang, Cheng
    Tian, Zai-Ke
    Feng, De-Long
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2013, 19 (12): : 2968 - 2975
  • [5] OPTIMAL PREVENTIVE MAINTENANCE POLICY UNDER A BUDGET CONSTRAINT
    Singh, Inderjeet
    Popova, Elmira
    Kee, Ernie
    ICONE16: PROCEEDING OF THE 16TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2008, VOL 1, 2008, : 13 - 18
  • [6] Optimal preventive maintenance policy for leased equipment for free with minimum quantity of consumables purchasing commitment by the lessee
    Tlili, Lazhar
    Anis, Chelbi
    Bouazizi, Mokhles
    JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2023, 29 (03) : 708 - 725
  • [7] An optimal sequential preventive maintenance policy under stochastic maintenance quality
    Liu, Yu
    Li, Yanfeng
    Huang, Hong-Zhong
    Kuang, Yuanhui
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2011, 7 (04) : 315 - 322
  • [8] Optimal Maintenance Policy for Equipment Submitted to Multi-Period Leasing as a Circular Business Model
    Ben Mabrouk, Amel
    Chelbi, Anis
    Aguir, Mohamed Salah
    Dellagi, Sofiene
    SUSTAINABILITY, 2024, 16 (12)
  • [9] Optimal imperfect preventive maintenance policy for equipment leased during successive periods
    Ben Mabrouk, A.
    Chelbi, A.
    Radhoui, M.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (17) : 5095 - 5110
  • [10] Optimal preventive maintenance policy for leased equipment using failure rate reduction
    Yeh, Ruey Huei
    Kao, Kow-Chin
    Chang, Wen Liang
    COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 57 (01) : 304 - 309