An evaluation model for city-scale construction and demolition waste management effectiveness: A case study in China

被引:5
|
作者
Wu, Huanyu [1 ,4 ]
Chen, Run [1 ,4 ]
Yuan, Hongping [2 ]
Yong, Qiaoqiao [1 ,4 ]
Weng, Xiangyi [1 ,4 ]
Zuo, Jian [3 ]
Zillante, George [3 ]
机构
[1] Shenzhen Univ, Coll Civil & Transportat Engn, Shenzhen 518060, Peoples R China
[2] Guangzhou Univ, Sch Management, Guangzhou 510006, Peoples R China
[3] Univ Adelaide, Sch Architecture & Built Environm, Adelaide, SA 5001, Australia
[4] Shenzhen Univ, Sino Australia Joint Res Ctr BIM & Smart Construct, Shenzhen 518060, Peoples R China
基金
中国国家自然科学基金;
关键词
Construction and demolition waste; Waste management effectiveness; Evaluation model; City-scale analysis; Guangdong-Hong Kong-Macao Greater Bay; Area; MANAGING CONSTRUCTION; DEVELOPING-COUNTRIES; CHARGING SCHEME; GENERATION; STRATEGIES; REDUCTION; DISPOSAL; INDUSTRY; SYSTEM; IMPACT;
D O I
10.1016/j.wasman.2024.04.047
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The growing generation of construction and demolition waste (CDW) has emerged as a prominent challenge on global environmental agendas. However, the effectiveness of CDW management (CDWM) strategies varies among cities. Existing literature predominantly evaluates the effectiveness of CDWM at the project level, offering a localized perspective that fails to capture a city's comprehensive CDWM profile. This localized focus has certain limitations. To fill this gap in city-scale evaluations, this study introduces a novel model for assessing CDWM effectiveness at the municipal level. An empirical investigation was conducted across 11 cities within the Guangdong-Hong Kong-Macao Greater Bay Area (GBA) to operationalize this model. The model defines five distinct levels of CDWM effectiveness. Findings indicate that Hong Kong consistently achieves the highest level (level I), while the majority of cities fall within levels III and IV. This pattern suggests that CDWM effectiveness in the GBA is moderately developed, with uneven progress in CDW management outcomes and supporting systems. Essentially, there is a lack of synchronous development of CDWM results and guarantee systems. The proposed evaluation model enriches existing CDWM research field and offers a framework that may inform future studies in other countries.
引用
收藏
页码:284 / 298
页数:15
相关论文
共 50 条
  • [1] A GIS and hybrid simulation aided environmental impact assessment of city-scale demolition waste management
    Ding, Zhikun
    Wen, Xinping
    Cao, Xiaoyan
    Yuan, Hongping
    SUSTAINABLE CITIES AND SOCIETY, 2022, 86
  • [2] A GIS and hybrid simulation aided environmental impact assessment of city-scale demolition waste management
    Ding, Zhikun
    Wen, Xinping
    Cao, Xiaoyan
    Yuan, Hongping
    Sustainable Cities and Society, 2022, 86
  • [3] Construction and Demolition Waste and Its Management Challenges in Iran: A Case Study in Tabriz City
    Taghipour, Hassan
    Jazadani, Reza Taghizadeh
    Dehghanzadeh, Reza
    Jafarabadi, Mohamad Asghari
    Mohammadi, Mohsen Mir
    Ghayebzadeh, Mehdi
    HEALTH SCOPE, 2019, 8 (02):
  • [4] Construction and Demolition Waste Management: A Case Study on Romania
    Dragan, Gabriela
    Marinoiu, Ana Maria
    Voicu-Dorobantu, Roxana
    ENERGY PROBLEMS AND ENVIRONMENTAL ENGINEERING, 2009, : 482 - +
  • [5] Construction and Demolition Waste Management (Tehran Case Study)
    Broujeni, Babak Rouhi
    Omrani, Ghassem Ali
    Naghavi, Reza
    Afraseyabi, Salar S.
    ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2016, 6 (06) : 1249 - 1252
  • [6] Development of a hybrid model to predict construction and demolition waste: China as a case study
    Song, Yiliao
    Wang, Yong
    Liu, Feng
    Zhang, Yixin
    WASTE MANAGEMENT, 2017, 59 : 350 - 361
  • [7] Construction and Demolition Waste Management in Urban Transformation: A Case Study for Performance Evaluation
    Yazgan, Ogulcan
    Ozturkoglu, Yucel
    Ozkan-Ozen, Yesim Deniz
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2023, 14 (01): : 121 - 133
  • [8] Policy instrument choice for construction and demolition waste management: the case study of Shenzhen, China
    Li, Jingru
    Zuo, Jian
    Jiang, Weiping
    Zhong, Xizeng
    Li, Jinggang
    Pan, Yulun
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (06) : 1283 - 1297
  • [9] Investigation of Construction and Demolition Waste, A Case Study in Deqing, China
    Xia, Min
    Zhang, Shuai
    Zhan, Liangtong
    PROCEEDINGS OF THE 8TH INTERNATIONAL CONGRESS ON ENVIRONMENTAL GEOTECHNICS, VOL 2: TOWARDS A SUSTAINABLE GEOENVIRONMENT, 2019, : 263 - 270
  • [10] Sustainable Management for Construction and Demolition Waste in China
    Yang, Lie
    Chen, Zhulei
    Liu, Ting
    Jiang, Juan
    Gong, Zhe
    ENERGY, ENVIRONMENT AND ENGINEERING, 2012, 4 : 53 - 59