A novel and efficient mathematical optimization model for multi-stage assembly flow shop considering post-processing

被引:0
|
作者
da Silva Santana, Jose Renatho [1 ]
Fuchigami, Helio Yochihiro [1 ,2 ]
机构
[1] Fed Univ Goias UFG, Fac Sci & Technol, Aparecida De Goiania, Brazil
[2] Fed Univ Sao Carlos UFSCar, Dept Prod Engn, Rod Washington Luis, BR-13565905 Sao Carlos, SP, Brazil
基金
巴西圣保罗研究基金会;
关键词
Scheduling; assembly flow shop; mixed-integer linear programming; mathematical optimization; multi-stage shop; post-processing; SCHEDULING PROBLEM;
D O I
10.1080/21681015.2024.2370847
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We addressed the multistage assembly flow shop problem with post-processing and makespan minimization, a production environment commonly encountered in diverse industries such as automotive, dental, medical equipment, and clothing manufacturing. In this context, we presented an innovative mixed-integer linear programming model with a position-based strategy. Our proposed formulation demonstrated remarkable efficiency when compared to the model of the literature. It achieved optimal solutions in 77.16% of instances, with an average optimality gap of 10.59%. This study constitutes a significant contribution to the efficient resolution of a practical and frequently encountered scheduling problem that has received relatively limited attention in existing literature. The findings highlight the crucial role of mathematical optimization models as valuable decision-making tools for scheduling within the addressed production system. [GRAPHICS]
引用
收藏
页码:1 / 13
页数:13
相关论文
共 26 条
  • [1] Scheduling a multi-stage fabrication shop for efficient subsequent assembly operations
    Lagodimos, AG
    Mihiotis, AN
    Kosmidis, VC
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2004, 90 (03) : 345 - 359
  • [2] Multi-Stage assembly flow shop with setup time and release time
    Sheikh, Shaya
    Komaki, G. M.
    Kayvanfar, Vahid
    Teymourian, Ehsan
    OPERATIONS RESEARCH PERSPECTIVES, 2019, 6
  • [3] Mathematical models for multi-stage hybrid assembly flow-shop scheduling with preventive maintenance and release times
    Alexander, David Anunay
    Pandey, Avishek
    Kumar, Sri Krishna
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 186
  • [4] Multi-Objective Optimization of Energy-Efficient Multi-Stage, Multi-Level Assembly Job Shop Scheduling
    Dong, Yingqian
    Liao, Weizhi
    Xu, Guodong
    APPLIED SCIENCES-BASEL, 2024, 14 (19):
  • [5] Order of operation for multi-stage post-processing of ensemble wind forecast trajectories
    Schuhen, Nina
    NONLINEAR PROCESSES IN GEOPHYSICS, 2020, 27 (01) : 35 - 49
  • [6] Multi-Stage Decoding Scheme with Post-Processing for LDPC Codes to Lower the Error Floors
    Shin, Beomkyu
    Park, Hosung
    No, Jong-Seon
    Chung, Habong
    IEICE TRANSACTIONS ON COMMUNICATIONS, 2011, E94B (08) : 2375 - 2377
  • [7] EFFICIENT ALGORITHMS FOR THE MULTI-STAGE FLEXIBLE FLOW SHOP SCHEDULING PROBLEM WITH TRANSPORTATION AND UNLOADING TIMES
    Hidri, Lotfi
    Tlija, Mehdi
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2024, 31 (04): : 709 - 733
  • [8] Multi-stage hybrid flow shop model for quay crane dual cycling in container terminals
    School of Transport Management, Dalian Maritime University, Dalian
    Liaoning
    116026, China
    Shanghai Jiaotong Daxue Xuebao, 4 (499-505):
  • [9] Multi-stage Optimization Model for Electricity Spot Market Clearing Considering Carbon Trading
    Dong F.
    Chi L.
    Meng Z.
    Dianwang Jishu/Power System Technology, 2024, 48 (01): : 79 - 90
  • [10] An Unbalance Optimization Method for a Multi-Stage Rotor Based on an Assembly Error Propagation Model
    Chen, Yue
    Cui, Jiwen
    Sun, Xun
    APPLIED SCIENCES-BASEL, 2021, 11 (02): : 1 - 17