Power Plant Maintenance Investment Decision Making Based on Reliability, Availability, Maintainability and Risk Cost Case Study: Replacement Tube HRSG 1.2 Combine Cycle Power Plant Belawan

被引:0
|
作者
Sazuli, Rakhmad [1 ]
Irawan, Mohammad Isa [1 ]
机构
[1] Sepuluh Nopember Inst Technol, Interdisciplinary Sch Management Technol, Surabaya, Indonesia
关键词
Availability; maintainability; reliability; risk cost;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This study analyzes the feasibility of investing in the HRSG 1.2 replacement tube as a guide in making decisions based on reliability, availability, maintainability as an operational aspect, and risk cost as a risk aspect and analyzes the financial aspect. This feasibility analysis was carried out on 3 alternative options, namely just replacing the leaking HRSG 1.2 tube or corrective maintenance, doing the HRSG 1.2 tube replacement as a whole and doing the HRSG 1.2 tube replacement partially. In the analysis of operational aspects, it was obtained an increase in the reliability value of HRSG 1.2 by 0.137, an increase in the availability of HRSG 1.2 by 0.016 and an increase in the maintainability of HRSG 1.2 by 0.0006, so that it could increase operational performance combine cycle power plant block I. In the financial aspect analysis, capital budgeting was calculated which resulted in a net present value of IDR 360.419.186.184 and an internal rate of return of 7,51%. Meanwhile, in the risk aspect analysis, the risk cost value is below the risk appetite statement and in the moderate category. So that the investment work to maintain the HRSG 1.2 CCPP Belawan replacement tube is feasible to increase company value.
引用
收藏
页码:1638 / 1645
页数:8
相关论文
共 5 条
  • [1] The fuzzy evaluation of investment risk decision-making of power plant based on the grey relation
    Liu, Shuliang
    Song, Yunxia
    TRENDS IN BUILDING MATERIALS RESEARCH, PTS 1 AND 2, 2012, 450-451 : 981 - 984
  • [2] Risk-based decision making method for maintenance policy selection of thermal power plant equipment
    Carazas, F. G.
    Souza, G. F. M.
    ENERGY, 2010, 35 (02) : 964 - 975
  • [3] Life Cycle Cost and Replacement Analysis for Power Plant Generator (Case study at PLTU Labuan unit #2)
    Luthfi, Ridho Faqih
    Sutikno
    INNOVATIVE SCIENCE AND TECHNOLOGY IN MECHANICAL ENGINEERING FOR INDUSTRY 4.0, 2019, 2187
  • [4] Introducing a method for Health, Safety and Environmental (HSE) risk assessment, using multi- criteria decision making (MCDM) techniques: a case study in power plant construction
    FazIollah, A.
    Mohammadfam, I.
    HadgiParvaneh, M. J.
    Omidvari, M.
    JOURNAL OF HEALTH AND SAFETY AT WORK, 2014, 4 (01) : 55 - +
  • [5] A risk-based multi-criteria spatial decision analysis for solar power plant site selection in different climates: A case study in Iran
    Shorabeh, Saman Nadizadeh
    Firozjaei, Mohammad Karimi
    Nematollahi, Omid
    Firozjaei, Hamzeh Karimi
    Jelokhani-Niaraki, Mohammadreza
    RENEWABLE ENERGY, 2019, 143 : 958 - 973