Selection and Layout Optimization of Double Tower Cranes

被引:1
|
作者
Fu, Yan [1 ]
Bu, Jiarui [1 ]
Lin, Jingjun [2 ]
Liu, Jun [3 ]
Zhang, Chunli [4 ]
机构
[1] Chongqing Univ, Sch Management Sci & Real Estate, Chongqing 400045, Peoples R China
[2] CCCC Urban Investment Holding Co Ltd, Guangzhou 510000, Peoples R China
[3] China Construct Second Engn Bur Ltd, Beijing, Peoples R China
[4] Chongqing Jianzhu Coll, Chongqing 400072, Peoples R China
关键词
tower crane; selection; layout; positioning optimization; value engineering; LOCATION; ALGORITHM; MODEL;
D O I
10.3390/buildings14061705
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
As the scale of construction expanded and the number of prefabricated buildings increased, a single tower crane could no longer meet the construction requirements, necessitating the simultaneous operation of more tower cranes to improve construction efficiency. To optimize the efficiency and cost of lifting prefabricated concrete components and address the selection and layout optimization of dual tower cranes, this paper proposed a double tower crane selection and positioning optimization model that integrated feasible layout area solving and optimization based on different objectives. By analyzing the mathematical relationship between the layout positions of the tower cranes and the positions of the prefabricated component storage yard and installation sites, a mathematical model for the feasible layout area of double tower cranes was established and solved using a genetic algorithm. On this basis, optimization models were established with the objectives of minimizing cost, achieving the shortest total lifting time, and achieving the maximum value coefficient, and they were solved using a genetic algorithm. The model was verified and analyzed through a case study. The research results indicated that the double tower crane selection scheme could achieve more than twice the lifting efficiency of the same model single tower crane. When the total lifting time was similar, choosing based on the principles of value engineering could yield the optimal solution with lower costs. These research findings provided a reference for the selection of tower crane schemes and the cost reduction and efficiency improvement of on-site prefabricated concrete component lifting construction.
引用
收藏
页数:28
相关论文
共 50 条
  • [1] Optimization of the double-suspension girder boom of tower cranes
    Tyapkin, A.F.
    Stroitel'nye i Dorozhnye Mashiny, 2002, (08): : 33 - 37
  • [2] Location optimization for a group of tower cranes
    Zhang, P.
    Harris, F.C.
    Olomolaiye, P.O.
    Holt, G.D.
    Journal of Construction Engineering and Management, 125 (02): : 115 - 122
  • [3] Location optimization for a group of tower cranes
    Zhang, P
    Harris, FC
    Olomolaiye, PO
    Holt, GD
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (02): : 115 - 122
  • [4] Discretized Cell Modeling for Optimal Layout of Multiple Tower Cranes
    Huang, Chun
    Wang, Zi Kang
    Li, Bei
    Wang, Cong
    Xu, Li Shan
    Jiang, Kai
    Liu, Meng
    Guo, Cai Xia
    Zhao, Xue Feng
    Yang, He
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2023, 149 (08)
  • [5] Tower Cranes
    Petroski, Henry
    AMERICAN SCIENTIST, 2008, 96 (06) : 458 - 461
  • [6] Manipulation with tower cranes exhibiting double-pendulum oscillations
    Singhose, William
    Kim, Dooroo
    PROCEEDINGS OF THE 2007 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOLS 1-10, 2007, : 4550 - +
  • [7] Control of Tower Cranes With Double-Pendulum Payload Dynamics
    Vaughan, Joshua
    Kim, Dooroo
    Singhose, William
    IEEE TRANSACTIONS ON CONTROL SYSTEMS TECHNOLOGY, 2010, 18 (06) : 1345 - 1358
  • [8] SELECTING TOWER CRANES
    PROCTOR, JR
    CIVIL ENGINEERING, 1995, 65 (02): : 52 - 53
  • [9] Adaptive tracking controller design for double-pendulum tower cranes
    Ouyang, Huimin
    Tian, Zheng
    Yu, Lili
    Zhang, Guangming
    MECHANISM AND MACHINE THEORY, 2020, 153
  • [10] Tower cranes layout planning using agent-based simulation considering activity conflicts
    Younes, Ahmed
    Marzouk, Mohamed
    AUTOMATION IN CONSTRUCTION, 2018, 93 : 348 - 360