A Multilayer Dig-Limit Approach for Reducing Ore and Profit Losses in an Open-Pit Mine Having Complex Orebody

被引:4
|
作者
Yu, Zhi [1 ,2 ]
Shi, Xiu-Zhi [3 ]
Zhang, Zong-Xian [2 ]
Zhou, Jian [3 ]
Cai, Xing-Qi [4 ]
He, Song [5 ]
Huang, Ming-Qing [6 ]
机构
[1] Fuzhou Univ, Zijin Sch Geol & Min, Fuzhou 350116, Peoples R China
[2] Univ Oulu, Oulu Min Sch, Oulu 90014, Finland
[3] Cent South Univ, Sch Resources & Safety Engn, Changsha 410083, Peoples R China
[4] China Gen Nucl Power Corp, Uranium Resource Co Ltd, Beijing 100029, Peoples R China
[5] Xinjiang Zhongyan Hengtai Blasting Engn Co Ltd, Urumqi 830046, Xinjiang, Peoples R China
[6] Fuzhou Univ, Zijin Sch Geol & Min, Fuzhou 350116, Peoples R China
关键词
Complex-orebody open-pit blast; Multilayer dig-limit optimization; Blast-induced rock movement; Ore recovery; Economic profit; MOVEMENT; OPTIMIZATION; PREDICTION; ENERGY;
D O I
10.1007/s00603-024-03928-0
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Rock fragment movement during blasting operations is a major cause of ore and profit losses in hard rock open-pit mines having a complex-orebody. To address this issue, a novel multilayer dig-limit approach, which well considers blast movement in dig-limit optimization, was proposed in this study by combining machine learning techniques and practical heuristic algorithms. First, horizontal and vertical blast-induced rock movement distances were predicted using a supervised learning model. Then, the movement direction of rock fragments was computed based on the initiation sequence. After meshing the blast block into rock units, the blasted muckpile and post-blast ore boundary were determined, providing a good basis for dig-limit determination. Finally, the optimized dig-limit with maximum profit can be calculated using a practical heuristic algorithm. By applying this method in a case study, the ore recovery and economic profit were improved, compared with manually drawn dig-limit method. Additionally, the impact of equipment size, number of layers and powder factor on the application of this method was discussed. The obtained results indicated that ore and profit losses can be reduced with a decreased equipment size, increased number of layers and decreased powder factor. A multilayer dig-limit approach considering blast-induced rock movement and dig-limit optimization was proposed.The multilayer dig-limit approach yields higher ore recovery and economic profit compared to manually drawn dig-limit.Ore losses can be reduced by decreasing the equipment size, increasing the number of layers and decreasing the powder factor.
引用
收藏
页码:7425 / 7441
页数:17
相关论文
共 5 条
  • [1] Exploring Deep Learning for Dig-Limit Optimization in Open-Pit Mines
    Jacob Williams
    Jagjit Singh
    Mustafa Kumral
    Julian Ramirez Ruiseco
    Natural Resources Research, 2021, 30 : 2085 - 2101
  • [2] Exploring Deep Learning for Dig-Limit Optimization in Open-Pit Mines
    Williams, Jacob
    Singh, Jagjit
    Kumral, Mustafa
    Ruiseco, Julian Ramirez
    NATURAL RESOURCES RESEARCH, 2021, 30 (03) : 2085 - 2101
  • [3] A Practical Approach to Mine Equipment Sizing in Relation to Dig-Limit Optimization in Complex Orebodies: Multi-Rock Type, Multi-Process, and Multi-Metal Case
    Julian Ramirez Ruiseco
    Mustafa Kumral
    Natural Resources Research, 2017, 26 : 23 - 35
  • [4] A Practical Approach to Mine Equipment Sizing in Relation to Dig-Limit Optimization in Complex Orebodies: Multi-Rock Type, Multi-Process, and Multi-Metal Case
    Ruiseco, Julian Ramirez
    Kumral, Mustafa
    NATURAL RESOURCES RESEARCH, 2017, 26 (01) : 23 - 35
  • [5] REDUCING LOSSES ORE BETWEEN WHOLE CHAMBER FOR THE DESIGN OF LOWER LAYERS MINE BY GUBKIN OF OPEN JOINT-STOCK COMPANY "INDUSTRIAL COMPLEX KMAruda"
    Boguslavskiy, E. I.
    Korhzavykh, P. V.
    JOURNAL OF MINING INSTITUTE, 2010, 186 : 50 - 53