Key Technology of the World's Heaviest Gear Tooth Rail Swivel Cable-stayed Bridge

被引:0
|
作者
Mei, Huihao [1 ]
Zhang, Chengbo [2 ]
Nie, Feng [2 ]
Wang, Huili [2 ]
机构
[1] China Railway 11th Bur Grp Co Ltd, Wuhan, Peoples R China
[2] Dalian Univ Technol, Natl & Local Joint Engn Lab Bridge & Tunnel Techno, Dalian, Peoples R China
关键词
cable-stayed bridge; swivel construction; gear tooth rail; spherical hinge;
D O I
10.1080/10168664.2024.2360965
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
During the swivel construction of a large-tonnage cable-stayed bridge, a single spherical hinge is susceptible to be damaged from excessive force. Consequently, this paper suggests a multi-point support swivel method of gear rails. The paper introduces a multi-point support swivel system of large-tonnage gear-tooth-rail, along with the swivel construction and monitoring technology. Models of the spherical hinge are established. Results indicate that the force applied to the spherical hinge is reasonable, exhibiting a gradual increase in contact stress from the center to the outer edges. The distribution of Mises stress differs from the distribution of contact stress. The force applied by the driving device is reasonable, ensuring the safety and feasibility of the proposed approach. The findings have guiding significance for future engineering.
引用
收藏
页码:643 / 650
页数:8
相关论文
共 50 条
  • [1] Swivel Construction of a Cable-Stayed Bridge for Minimal Disturbance to Adjacent Railways
    Wang, Dianyong
    Liu, Zhongxiang
    Gao, Jie
    Li, Chuan
    Guo, Tong
    STRUCTURAL ENGINEERING INTERNATIONAL, 2023, 33 (03) : 498 - 505
  • [2] Analysis on Vertical Swivel Construction of Cable-Stayed Bridge with Steel Arch Pylon
    Li, Qionghui
    Wang, Xiangyang
    Han, Lili
    APPLIED MECHANICS AND MATERIALS II, PTS 1 AND 2, 2014, 477-478 : 635 - 639
  • [3] Design of Transitional Cable-Stayed Bridge for Constructing Egongyan Rail Transit Bridge
    Chen, Ning-Xian
    Zhang, Hai-Shun
    Bridge Construction, 2020, 50 (05): : 101 - 106
  • [4] Technology and Application for Modal testing of Cable-stayed Bridge
    Zou, Yi Song
    Chang, Quan Hui
    Peng, Wei
    VIBRATION, STRUCTURAL ENGINEERING AND MEASUREMENT II, PTS 1-3, 2012, 226-228 : 396 - +
  • [5] Bridge-Rail Interaction for Continuous Welded Rail on Cable-Stayed Bridge due to Temperature Change
    Wang, Ping
    Zhao, Weihua
    Chen, Rong
    Xiao, Jieling
    ADVANCES IN STRUCTURAL ENGINEERING, 2013, 16 (08) : 1347 - 1354
  • [6] Structures - Hong Kong to boast world's longest cable-stayed bridge
    Brown, JL
    CIVIL ENGINEERING, 2001, 71 (01): : 10 - 10
  • [8] Experimental Research on Stability of Cable-Stayed Bridge with Central Cable Plane During Large Cantilever Swivel Process
    Mao L.
    Chen Y.
    Yang Q.
    Xu K.
    Bridge Construction, 2023, 53 : 88 - 96
  • [9] RESEARCH ON UNBALANCED WEIGHING EXPERIMENT OF MULTI-POINT BRACED SWIVEL CABLE-STAYED BRIDGE
    Tang, Zhipeng
    Sun, Quansheng
    Gu, Zifeng
    Zhao, Yafeng
    Zhang, Haoyang
    CIVIL ENGINEERING JOURNAL-STAVEBNI OBZOR, 2023, 33 (03): : 383 - 396
  • [10] SUEHIRO BRIDGE, JAPAN'S LONGEST CABLE-STAYED BRIDGE.
    Hatano, Yoshitaka
    Okamoto, Tadao
    Yamaguchi, Kunihiko
    Acier Stahl Steel, 1976, 41 (7-8): : 270 - 274